Joint Optimization of Condition-Based Repair-by-Replacement and Spare Parts Provisioning Policy with Random Maintenance Time and Lead Time

被引:3
|
作者
Zhang, Xiao-hong [1 ]
Zeng, Jian-chao [1 ]
机构
[1] Taiyuan Univ Sci & Technol, Div Ind & Syst Engn, Taiyuan, Peoples R China
关键词
Joint optimization; Condition-based repair-by-replacement; (Ss) type spare provisioning policy; Repair capacity; Random maintenance time; Random lead time; PREVENTIVE MAINTENANCE; SYSTEMS;
D O I
10.2991/978-94-6239-180-2_34
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A joint strategy, referred to as periodical condition-based repair-by-replacement and continuous reviewed (S, s) type spare provisioning policy, is presented for continuous deteriorating systems with a known number of identical repairable components. Maintenance consists of replacing all failed and/or deteriorated components, and then deteriorated components being repaired off-line. With assumptions of random repair time, random lead time for spare parts ordering and imperfect maintenance effect, a stochastic simulation model is developed to determine the jointly optimal strategy. The objective function of the model represents the average cost per component per unit time over an infinite time span, while inspection interval, preventive replacement threshold, spare part inventory levels and repair capacity are chosen as decision variables. The optimal result is obtained using integrating approach with discrete event simulation and genetic algorithm (GA). Simulation results indicate that there are trades-off among maintenance policy, spare parts inventory and repair capacity.
引用
收藏
页码:347 / 357
页数:11
相关论文
共 50 条
  • [1] Joint optimization of condition-based repair-by-replacement and spare parts provisioning policy for repairable critical components
    Division of Industrial and System Engineering, Taiyuan University of Science and Technology, Taiyuan 030024, China
    不详
    Jisuanji Jicheng Zhizao Xitong, 4 (909-918):
  • [2] Joint optimization of condition-based preventive maintenance and spare parts provisioning policy for equipment maintenance
    Zhang, Xiaohong
    Zeng, Jianchao
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2015, 51 (11): : 150 - 158
  • [3] Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems
    Zhang, Xiaohong
    Zeng, Jianchao
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (02) : 479 - 498
  • [4] Joint Optimization of Condition-based Preventive Maintenance and Spare Ordering Policy
    Xie, Jun
    Wang, Hongwei
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 6195 - 6199
  • [5] Joint optimization decision of equipment condition-based maintenance and spare parts inventory
    Lu C.
    Xu T.
    Wang H.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2019, 41 (07): : 1560 - 1567
  • [6] An optimum condition-based replacement and spare provisioning policy based on Markov chains
    Wang, Ling
    Chu, Jian
    Mao, Weijie
    JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2008, 14 (04) : 387 - +
  • [7] Optimization of Joint Policy of Condition-Based Maintenance and Spare Part Ordering Considering Imperfect Maintenance
    Zhao F.
    Li X.
    Guo M.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2022, 43 (10): : 1413 - 1421
  • [8] Joint policy optimization of condition-based maintenance and spare ordering considering competing failure
    Zhao F.
    Li X.
    Zhang J.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2023, 45 (01): : 291 - 301
  • [9] Condition-based maintenance for redundant systems considering spare inventory with stochastic lead time
    Wang, Jun
    Fu, Yuqiang
    Zhou, Jian
    Yang, Lechang
    Yang, Yating
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2025, 257
  • [10] Joint Policy Optimization of Quality Control, Condition-Based Maintenance and Spare Ordering for a Degradation System
    Han M.
    Ma S.
    Yang J.
    Li W.
    Ma Z.
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2024, 58 (03): : 361 - 370