Stochastic Multi-variate Performance Trade-off Method for Technical Tender Evaluation

被引:6
作者
Yi, Chang-Yong [1 ]
Gwak, Han-Seong [1 ]
Kim, Byung-Soo [2 ]
Lee, Dong-Eun [1 ]
机构
[1] Kyungpook Natl Univ, Sch Architecture & Civil Engn, Daegu 41566, South Korea
[2] Kyungpook Natl Univ, Dept Civil Engn, Daegu 41566, South Korea
基金
新加坡国家研究基金会;
关键词
multi-objective optimization; genetic algorithm; analytic hierarchical process; trade-off; simulation; scheduling; MULTIOBJECTIVE OPTIMIZATION; CONSTRUCTION TIME; GENETIC ALGORITHMS; ENERGY-EFFICIENCY; COST;
D O I
10.1007/s12205-018-2563-4
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a computational method called Stochastic Multi-variate Performance Trade-off (SMPT), which identifies optimal sets of construction methods for activities, hence appropriately trading-off the project completion time, cost, environmental impact, and quality. SMPT computes exact solution(s), near-optimal solution(s), and stochastic optimal solution(s) using an enumerative analysis, genetic algorithm, and simulation, respectively. This study is of value to project planners because SMPT identifies the sets of construction methods that satisfy user-defined constraints relative to specific performance indicators. SMPT is also of relevance to researchers because it facilitates experiments using different performance indicators, either jointly or independently. Three test cases verify the validity of the computational methods.
引用
收藏
页码:4240 / 4253
页数:14
相关论文
共 31 条
[11]   Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search [J].
Geem, Zong Woo .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06) :711-716
[12]   Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm [J].
Ghoddousi, Parviz ;
Eshtehardian, Ehsan ;
Jooybanpour, Shirin ;
Javanmardi, Ashtad .
AUTOMATION IN CONSTRUCTION, 2013, 30 :216-227
[13]   Optimization of construction time-cost trade-off analysis using genetic algorithms [J].
Hegazy, T .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) :685-697
[14]   Stochastic time-cost optimization using non-dominated archiving ant colony approach [J].
Kalhor, E. ;
Khanzadi, M. ;
Eshtehardian, E. ;
Afshar, A. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (08) :1193-1203
[15]   Optimization Research: Enhancing the Robustness of Large-Scale Multiobjective Optimization in Construction [J].
Kandil, Amr ;
El-Rayes, Khaled ;
El-Anwar, Omar .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (01) :17-25
[16]   Multi-objective optimization using genetic algorithms: A tutorial [J].
Konak, Abdullah ;
Coit, David W. ;
Smith, Alice E. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (09) :992-1007
[17]   Automated statistical analysis in stochastic project scheduling simulation [J].
Lee, DE ;
Arditi, D .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (03) :268-277
[18]  
Lee H. G., 2015, COMPUTER AIDED CIVIL, pAn
[19]   Using improved genetic algorithms to facilitate time-cost optimization [J].
Li, H ;
Love, P .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1997, 123 (03) :233-237
[20]   SCHEDULE COMPRESSION USING THE DIRECT STIFFNESS METHOD [J].
MOSELHI, O .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1993, 20 (01) :65-72