Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times
被引:55
作者:
Feng, Xin
论文数: 0引用数: 0
h-index: 0
机构:
Xi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
State Key Lab Mfg Syst Engn, Xian, Peoples R China
Minist Educ, Key Lab Proc Control & Efficiency Engn, Xian, Peoples R ChinaXi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
Feng, Xin
[1
,3
,4
]
Zheng, Feifeng
论文数: 0引用数: 0
h-index: 0
机构:
Donghua Univ, Glorious Sun Sch Business & Management, Shanghai, Peoples R ChinaXi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
Zheng, Feifeng
[2
]
Xu, Yinfeng
论文数: 0引用数: 0
h-index: 0
机构:
Xi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
State Key Lab Mfg Syst Engn, Xian, Peoples R China
Minist Educ, Key Lab Proc Control & Efficiency Engn, Xian, Peoples R ChinaXi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
Xu, Yinfeng
[1
,3
,4
]
机构:
[1] Xi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
[2] Donghua Univ, Glorious Sun Sch Business & Management, Shanghai, Peoples R China
[3] State Key Lab Mfg Syst Engn, Xian, Peoples R China
[4] Minist Educ, Key Lab Proc Control & Efficiency Engn, Xian, Peoples R China
This paper studies the makespan minimisation scheduling problem in a two-stage hybrid flow shop. The first stage has one machine and the second stage has m identical parallel machines. Neither the processing time nor probability distribution of the processing time of each job is uncertain. We propose a robust (min-max regret) scheduling model. To solve the robust scheduling problem, which is NP-hard, we first derive some properties of the worst-case scenario for a given schedule. We then propose both exact and heuristic algorithms to solve this problem. In addition, computational experiments are conducted to evaluate the performance of the proposed algorithms.