Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times

被引:55
作者
Feng, Xin [1 ,3 ,4 ]
Zheng, Feifeng [2 ]
Xu, Yinfeng [1 ,3 ,4 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
[2] Donghua Univ, Glorious Sun Sch Business & Management, Shanghai, Peoples R China
[3] State Key Lab Mfg Syst Engn, Xian, Peoples R China
[4] Minist Educ, Key Lab Proc Control & Efficiency Engn, Xian, Peoples R China
基金
中国国家自然科学基金;
关键词
hybrid flow shop scheduling; makespan minimisation; min-max regret; uncertain processing times; 2-MACHINE FLOWSHOP; PARALLEL MACHINES; HEURISTICS; REGRET; MAKESPAN;
D O I
10.1080/00207543.2016.1162341
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies the makespan minimisation scheduling problem in a two-stage hybrid flow shop. The first stage has one machine and the second stage has m identical parallel machines. Neither the processing time nor probability distribution of the processing time of each job is uncertain. We propose a robust (min-max regret) scheduling model. To solve the robust scheduling problem, which is NP-hard, we first derive some properties of the worst-case scenario for a given schedule. We then propose both exact and heuristic algorithms to solve this problem. In addition, computational experiments are conducted to evaluate the performance of the proposed algorithms.
引用
收藏
页码:3706 / 3717
页数:12
相关论文
共 25 条
[21]   A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop [J].
Tsubone, H ;
Suzuki, M ;
Uetake, T ;
Ohba, M .
DECISION SCIENCES, 2000, 31 (01) :197-222
[22]   A production scheduling system in a hybrid flow shop [J].
Uetake, T ;
Tsubone, H ;
Ohba, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 41 (1-3) :395-398
[23]  
Vignier A., 1999, RAIRO-Operations Research-Recherche Operationnelle, V33, P117, DOI DOI 10.1051/RO:1999108
[24]   Robust makespan minimisation in identical parallel machine scheduling problem with interval data [J].
Xu, Xiaoqing ;
Cui, Wentian ;
Lin, Jun ;
Qian, Yanjun .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) :3532-3548
[25]   On the robust single machine scheduling problem [J].
Yang, J ;
Yu, G .
JOURNAL OF COMBINATORIAL OPTIMIZATION, 2002, 6 (01) :17-33