共 50 条
- [1] The Monitoring Data Analysis of Cover System in Subway Station ADVANCES IN STRUCTURAL ENGINEERING, PTS 1-3, 2011, 94-96 : 1814 - +
- [2] Monitoring and analysis of excavation-induced subsidence of subway station constructed by arch cover method and control measures Zhang, G. (150095711@qq.com), 1600, Academia Sinica (31): : 3413 - 3420
- [3] Effect of Excavation Blasting in the Arch Cover Method on Adjacent Existing Pipelines in a Subway Station APPLIED SCIENCES-BASEL, 2022, 12 (03):
- [5] Review on Construction Method of Subway Station MATERIALS PROCESSING TECHNOLOGY, PTS 1-3, 2012, 418-420 : 2078 - 2081
- [6] Analysis of open cut method and local cover-excavation method in subway station construction Electronic Journal of Geotechnical Engineering, 2015, 20 (04): : 1483 - 1493
- [7] Optimization of Construction Sequence of Buckle Arch in PBA Subway Station PROCEEDINGS OF THE 2024 8TH INTERNATIONAL CONFERENCE ON CIVIL ARCHITECTURE AND STRUCTURAL ENGINEERING, ICCASE 2024, 2024, 33 : 769 - 774
- [9] A New Subway Station Construction Method: Top-down Boring with Cast-in-situ Arch ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 1706 - 1710
- [10] Optimization of construction method for Shijiazhuang Xinbai Subway Station ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1203 - +