Optimization of process integration and multi-skilled resource utilization in off-site construction

被引:88
作者
Arashpour, Mehrdad [1 ]
Wakefield, Ron [1 ]
Blismas, Nick [1 ]
Minas, James [2 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, Melbourne, Vic 3000, Australia
[2] Wilfrid Laurier Univ, Sch Business & Econ Operat & Decis Sci, Waterloo, ON N2L 3C5, Canada
关键词
Building operations; Flexible cross-training; Multi-skilled resources; Off-site production; Prefabricated construction; Productivity and performance measures; Project management; Process integration; SYSTEM; PRODUCTIVITY; BENEFITS; DESIGN; LINES;
D O I
10.1016/j.autcon.2014.12.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Traditional approaches in construction project management assign each process to a trade contractor with an individual specialisation, and trades with the greatest work content (bottlenecks) have a significant influence on the progress rate of projects. A system with integrated processes, however, is able to function dynamically in response to variability in product demand and labour resources. This investigation aims to compare and contrast cross-training strategies that are applicable to off-site construction in order to create multi-skilled resources. To this end, the optimal number of additional skills was formulated as a constrained optimization problem. Then, production data from two prefabricated production facilities in Melbourne and Brisbane, Australia were used to construct a total of 1080 simulation experiments. Tangible performance metrics of systems were used to compare process integration strategies and use of multi-skilled resources. Findings show that choosing optimal process integration architecture depends on the level of capacity imbalance and processing time variability. This investigation optimises the decision making on process integration in off-site construction networks. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:72 / 80
页数:9
相关论文
共 45 条
  • [1] Off-Site Construction Planning Using Discrete Event Simulation
    Alvanchi, Amin
    Azimi, Reza
    Lee, SangHyun
    AbouRizk, Simaan M.
    Zubick, Paul
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2012, 18 (02) : 114 - 122
  • [2] Design Principles for Flexible Systems
    Andradottir, Sigrun
    Ayhan, Hayriye
    Down, Douglas G.
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2013, 22 (05) : 1144 - 1156
  • [3] [Anonymous], CIB WORLD BUILD C 20
  • [4] [Anonymous], J PHYS C SER
  • [5] [Anonymous], 2013, STAT METHODS SURVIVA
  • [6] A New Approach for Modelling Variability in Residential Construction Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Lee, Eric Wai Ming
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2013, 13 (02): : 83 - 92
  • [7] Arashpour M, 2012, CONSTR ECON BUILD, V12, P1
  • [8] Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Lee, E. W. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (02)
  • [9] Arashpour M, 2011, INT P ECON DEV RES, V2, P32
  • [10] Arashpour M, 2010, PROCEEDINGS OF THE 6TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, P23