Shutdown dose-rate assessment during the replacement of in-vessel components for a fusion DEMO reactor

被引:6
作者
Someya, Youji [1 ]
Utoh, Hiroyasu [1 ]
Hiwatari, Ryoji [1 ]
Tanigawa, Hisashi [1 ]
Tobita, Kenji [1 ]
机构
[1] Natl Inst Quantum & Radiol Sci & Technol, Rokkasho, Aomori, Japan
关键词
Fusion reactor; DEMO; Remote handling; Shutdown dose rate; REMOTE MAINTENANCE; DESIGN;
D O I
10.1016/j.fusengdes.2017.02.108
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The shutdown dose rate at Japan's demonstration nuclear fusion (DEMO) plant was analyzed using MCNP-5 and DCHAIN-SP2001 to assess its significance in the development of a maintenance program. It was assumed that the blanket segments were integrated with a shielding plug (SP) and replaced through vertical upper ports, whereas divertor cassettes, also integrated with the SP, were replaced through bottom ports. To minimize the dose rate, remote handling equipment should approach from behind the SP and be fixed with an attachment to it. The estimated dose rates during manifold cutting and rewelding in the maintenance ports were as low as 0.01 Gy/h for the blanket segment and 0.1 Gy/h for the divertor cassette. When the outboard blanket segments and divertor cassettes were removed along with the SP, a spatial dose rate of 100 Gy/h was found at the maintenance ports. The spatial dose rate of the in-vacuum vessel at ITER during maintenance using remote handling equipment is limited to 250 Gy/h. The study confirmed that a maintenance scheme involving pipe cutting or rewelding would be applicable to ITER at the estimated spatial dose rates. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:615 / 618
页数:4
相关论文
共 15 条
[1]  
Aidama D Lopez, 2004, INDCNDS46 IAEA
[2]   Concept for a vertical maintenance remote handling system for multi module blanket segments in DEMO [J].
Coleman, M. ;
Sykes, N. ;
Cooper, D. ;
Iglesias, D. ;
Bastow, R. ;
Loving, A. ;
Harman, J. .
FUSION ENGINEERING AND DESIGN, 2014, 89 (9-10) :2347-2351
[3]  
Kai T., 2001, DCHAIN SP 2001 HIGH
[4]   Progress of R&D and design of blanket remote handling equipment for ITER [J].
Kakudate, S. ;
Takeda, N. ;
Nakahira, M. ;
Matsumoto, Y. ;
Shibamuma, K. ;
Tesini, A. .
FUSION ENGINEERING AND DESIGN, 2008, 83 (10-12) :1850-1855
[5]   Pre-conceptual design assessment of DEMO remote maintenance [J].
Loving, A. ;
Crofts, O. ;
Sykes, N. ;
Iglesias, D. ;
Coleman, M. ;
Thomas, J. ;
Harman, J. ;
Fischer, U. ;
Sanz, J. ;
Siuko, M. ;
Mittwollen, M. .
FUSION ENGINEERING AND DESIGN, 2014, 89 (9-10) :2246-2250
[6]  
Paschenko A.B., 1996, IAEAINDCNDS341
[7]   Design study of blanket structure based on a water-cooled solid breeder for DEMO [J].
Someya, Youji ;
Tobita, Kenji ;
Utoh, Hiroyasu ;
Tokunaga, Shinji ;
Hoshino, Kazuo ;
Asakura, Nobuyuki ;
Nakamura, Makoto ;
Sakamoto, Yoshiteru .
FUSION ENGINEERING AND DESIGN, 2015, 98-99 :1872-1875
[8]   MANAGEMENT STRATEGY FOR RADIOACTIVE WASTE IN THE FUSION DEMO REACTOR [J].
Someya, Youji ;
Tobita, Kenji ;
Utoh, Hiroyasu ;
Asakura, Nobuyuki ;
Sakamoto, Yoshiteru ;
Hoshino, Kazuo ;
Nakamura, Makoto ;
Tokunaga, Shinsuke .
FUSION SCIENCE AND TECHNOLOGY, 2015, 68 (02) :423-427
[9]   Mock-up test on key components of ITER blanket remote handling system [J].
Takeda, Nobukazu ;
Kakudate, Satoshi ;
Nakahira, Masataka ;
Matsumoto, Yasuhiro ;
Taguchi, Koh ;
Kozaka, Hiroshi ;
Shibanuma, Kiyoshi ;
Tesini, Alessandro .
FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) :1813-1817
[10]   Materials design data for reduced activation martensitic steel type F82H [J].
Tavassoli, AAF ;
Rensman, JW ;
Schirra, M ;
Shiba, K .