A control system project development model derived from System Dynamics

被引:5
作者
White, A. S. [1 ]
机构
[1] Middlesex Univ, Sch Engn & Informat Sci, London NW4 4BT, England
关键词
Project development; Reduced model; Minimal project model; System dynamics; Control system analysis;
D O I
10.1016/j.ijproman.2010.07.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper examines established Systems Dynamics (SD) models of projects in order to simplify them. These models are highly non-linear and contain large numbers of variables, with built in decisions using empirical data. A SIMULINK version of an SD model was created and conclusions are made with respect to the main controlling factors, compared to a NASA project. Stages in simplification are described leading to a control system model. This model is then used to develop criteria to judge stability, controllability and observability of projects with use for practical decisions by project managers. All the models and the NASA data are compared to allow the reader to judge the efficacy of the simulation. The developed model is then compared with another project solution. (c) 2010 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:696 / 705
页数:10
相关论文
共 26 条
[1]  
Abdel-Hamid T., 1991, SOFTWARE PROJECT DYN
[2]   LESSONS LEARNED FROM MODELING THE DYNAMICS OF SOFTWARE-DEVELOPMENT [J].
ABDELHAMID, TK ;
MADNICK, SE .
COMMUNICATIONS OF THE ACM, 1989, 32 (12) :1426-&
[3]   Analysis of cost and schedule performance of international development projects [J].
Ahsan, Kamrul ;
Gunawan, Indra .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (01) :68-78
[4]  
[Anonymous], 1999, VENSIM 4 MODELING GU
[5]  
[Anonymous], CHALL COMPL IT PROJ
[6]   A formal model of the software test process [J].
Cangussu, JW ;
DeCarlo, RA ;
Mathur, AP .
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2002, 28 (08) :782-796
[7]  
D'Azzo JohnJ., 1988, LINEAR CONTROL SYSTE, V3rd
[8]   A discrete transfer function model to determine the dynamic stability of a vendor managed inventory supply chain [J].
Disney, SM ;
Towill, DR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (01) :179-204
[9]  
Forrester J.W., 1961, Industrial Dynamics
[10]  
Gilb T, 2005, COMPETITIVE ENGINEERING: A HANDBOOK FOR SYSTEMS ENGINEERING, REQUIREMENTS ENGINEERING, AND SOFTWARE ENGINEERING USING PLANGUAGE, P1, DOI 10.1016/B978-075066507-0/50005-2