Cyclic scheduling in robotic flowshops

被引:150
作者
Crama, Y
Kats, V
van de Klundert, J
Levner, E
机构
[1] Univ Liege, Ecole Adm Affaires, B-4000 Liege, Belgium
[2] Ben Gurion Univ Negev, Dept Ind Engn & Management, IL-84105 Beer Sheva, Israel
[3] Univ Maastricht, Fac Gen Sci, Dept Math, NL-6200 MD Maastricht, Netherlands
[4] Ctr Technol Educ, Dept Comp Syst, IL-58102 Holon, Israel
关键词
D O I
10.1023/A:1018995317468
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Fully automated production cells consisting of flexible machines and a material handling robot have become commonplace in contemporary manufacturing systems. Much research on scheduling problems arising in such cells, in particular in flowshop-like production cells, has been reported recently. Although there are many differences between the models, they all explicitly incorporate the interaction between the materials handling and the classical job processing decisions, since this interaction determines the efficiency of the cell. This paper surveys cyclic scheduling problems in robotic flowshops, models for such problems, and the complexity of solving these problems, thereby bringing together several streams of research that have by and large ignored one another, and describing and establishing links with other scheduling problems and combinatorial topics.
引用
收藏
页码:97 / 124
页数:28
相关论文
共 90 条
[1]   No-wait flow shop scheduling with large lot sizes [J].
Agnetis, A .
ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) :415-438
[2]  
AGNETIS A, 1997, 2197 U STUD ROM
[3]  
AIZENSHTAT VS, 1963, DOKLADY ACAD NAUK BS, V7, P148
[4]  
AIZENSHTAT VS, 1963, DOKLADY BYELORUSSIAN, V7, P224
[5]  
[Anonymous], ROBOTS MANUFACTURING
[6]   A BOUNDING SCHEME FOR DERIVING THE MINIMAL CYCLE TIME OF A SINGLE-TRANSPORTER N-STAGE PROCESS WITH TIME-WINDOW CONSTRAINTS [J].
ARMSTRONG, R ;
LEI, L ;
GU, SH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 78 (01) :130-140
[7]  
BARTHOLDI JJ, 1980, OPER RES, V28, P1073
[8]   SCHEDULING WITH RESOURCE-MANAGEMENT IN MANUFACTURING SYSTEMS [J].
BLAZEWICZ, J ;
FINKE, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) :1-14
[9]  
Brauner N, 1999, INFOR, V37, P20
[10]  
BRAUNER N, IN PRESS MATH COMPUT