Economic analysis of BIPV systems as a building envelope material for building skins in Europe

被引:105
作者
Gholami, Hassan [1 ]
Rostvik, Harald Nils [1 ]
机构
[1] Univ Stavanger, Dept Safety Econ & Planning, Kjell Arholmsgate 41, N-4036 Stavanger, Norway
关键词
BIPV; Building integrated photovoltaics; LCCA; Lifecycle cost analysis; NPV; Net present value; DPP; Discounted payback period; IRR; Internal rate of return; Carbon tax; OF-THE-ART; PHOTOVOLTAIC THERMAL SYSTEM; CYCLE COST-ANALYSIS; ENERGY; PERFORMANCE; BARRIERS; IMPACTS; FACADES; RATES;
D O I
10.1016/j.energy.2020.117931
中图分类号
O414.1 [热力学];
学科分类号
摘要
The main purpose of this study is to evaluate the economic feasibility of the BIPV system as a building envelope material for the whole building skins. The paper is dealing with the lifecycle cost analysis (LCCA) of BIPV system in the capitals of all the European Union member states (EU) as well as the capitals of Norway and Switzerland. The results revealed that by a discount rate of zero, BIPV system could refund all the investment even on the north facades while in terms of traditional building envelope materials as an alternative option for building skins, there would be rarely added benefits after investment. Furthermore, the societal and environmental benefits of a BIPV system in Europe have its greatest impact on the south facade. Moreover, for all the studied directions of building skins with a discount rate of five present in Europe except the north facade, just the quantified amount of societal and environmental advantages of BIPV systems could almost reimburse all the invested money. The results illustrated that the BIPV system as a building envelope material for the whole building skins could reimburse not only all the investment costs but also become a source of income for the building. (C) 2020 The Authors. Published by Elsevier Ltd.
引用
收藏
页数:17
相关论文
共 62 条
[1]  
2019 The World Bank Group (WBG), 2018, EL POW TRANSM DISTR
[2]   Life cycle cost assessment of building integrated photovoltaic thermal (BIPVT) systems [J].
Agrawal, Basant ;
Tiwari, G. N. .
ENERGY AND BUILDINGS, 2010, 42 (09) :1472-1481
[3]   First smart 8.64 kW BIPV in a building in Awali Town at Kingdom of Bahrain [J].
Alnaser, Naser W. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 82 :205-214
[4]  
Aniti L., 2017, TODAY ENERGY
[5]  
[Anonymous], 2019, Fiscal Monitor: Curbing Corruption April
[6]  
[Anonymous], CARBON PRICING DASHB
[7]  
[Anonymous], 2018, Global Energy CO2 Status Report 2017
[8]   Wind farm and solar park effects on plant-soil carbon cycling: uncertain impacts of changes in ground-level microclimate [J].
Armstrong, Alona ;
Waldron, Susan ;
Whitaker, Jeanette ;
Ostle, Nicholas J. .
GLOBAL CHANGE BIOLOGY, 2014, 20 (06) :1699-1706
[9]   Product life cycle cost analysis: state of the art review [J].
Asiedu, Y ;
Gu, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (04) :883-908
[10]   The first Italian BIPV project: Case study and long-term performance analysis [J].
Aste, N. ;
Del Pero, C. ;
Leonforte, F. .
SOLAR ENERGY, 2016, 134 :340-352