A Discrete Time-Cost-Environment Trade-Off Problem with Multiple Projects: The Jinping-I Hydroelectric Station Project

被引:1
作者
Zheng, Huan [1 ,2 ]
机构
[1] Chongqing Technol & Business Univ, Sch Management, Chongqing 400067, Peoples R China
[2] Widener Univ, Sch Engn, Philadelphia, PA 19013 USA
来源
PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT | 2018年
关键词
Time-cost-environment; Trade-off; Multiple project; Fuzzyt; Hybrid genetic algorithm; CONSTRUCTION; OPTIMIZATION; UNCERTAINTY;
D O I
10.1007/978-3-319-59280-0_144
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Stronger environmental protection regulations and innovative contracting methods focused on reducing environmental impact through new incentives have placed increasing pressure on decision makers, especially those on large-scale construction projects. This increase has led to a need to identify optimal decision and select the most efficient construction modes for each activity to minimize not only the project's time and penalty costs but also its environmental impact. To address this need, this paper applies a mathematical model based on a hybrid genetic algorithm with fuzzy logic controller (flc-hGA) to the time-costenvironmental trade-off problem with multiple projects under a fuzzy environment. Applying the proposed method to the case study of the Jinping-I Hydropower Station, a large-scale project in Southwest China, clearly demonstrates its economic, technological, and social ecological effectiveness.
引用
收藏
页码:1709 / 1721
页数:13
相关论文
共 20 条
  • [1] A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations
    Afruzi, Elham Nabipoor
    Najafi, Amir Abbas
    Roghanian, Emad
    Mazinani, Mostafa
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2014, 50 : 80 - 96
  • [2] The cumulative effects of dam project on river ecosystem based on multi-scale ecological network analysis
    Chen, Shaoqing
    Chen, Bin
    Su, Meirong
    [J]. INTERNATIONAL WORKSHOP FROM THE INTERNATIONAL CONGRESS ON ENVIRONMENTAL MODELING AND SOFTWARE (IEMSS2010), 2011, 5 : 12 - 17
  • [3] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [4] Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling
    Franck, B
    Neumann, K
    Schwindt, C
    [J]. OR SPEKTRUM, 2001, 23 (03) : 297 - 324
  • [5] Gen MitsuoRunwei Cheng Lin Lin., 2008, NETWORK MODELS OPTIM
  • [6] Harvey R. T., 1979, Foundations of Control Engineering, V4, P107
  • [7] Holland I.H., 1975, ADAPTATION NATURAL A
  • [8] Project management for uncertainty with multiple objectives optimisation of time, cost and reliability
    Jeang, Angus
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (05) : 1503 - 1526
  • [9] Modeling project time-cost trade-off in fuzzy random environment
    Ke, Hua
    Ma, Junjie
    [J]. APPLIED SOFT COMPUTING, 2014, 19 : 80 - 85
  • [10] Luong Duc Long, 2008, International Journal of Project Management, V26, P688, DOI 10.1016/j.ijproman.2007.09.012