Order release in a workload controlled flow-shop with sequence-dependent set-up times

被引:28
作者
Fernandes, Nuno O. [1 ]
Carmo-Silva, S. [2 ]
机构
[1] Polytech Inst Castelo Branco, Dept Ind Engn, Castelo Branco, Portugal
[2] Univ Minho, Dept Prod & Syst, P-4710057 Braga, Portugal
关键词
order release; set-up time; simulation; JOB-SHOP; PERFORMANCE;
D O I
10.1080/00207541003720376
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we report a simulation study on the role of sequence-dependent set-up times in decision making at the order release level of a workload controlled make-to-order flow-shop. The study evaluates the potential for set-ups savings, dependent on the level of workload in the shop, for two alternative strategies, namely considering set-up times centrally, within the release decision or locally, within the dispatching decision. These strategies are compared and assessed on the basis of two main performance measures namely time in system and standard deviation of the job lateness. Results indicate that the local strategy, which has been traditionally adopted in practice and in most of the studies dealing with sequence-dependent set-up times, does not always give the best results. The release frequency and the shop workload appear critical to the selection of the strategy to adopt, strongly influencing system performance.
引用
收藏
页码:2443 / 2454
页数:12
相关论文
共 24 条
[1]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[2]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[3]   THEORY AND PRACTICE OF LOAD-ORIENTED MANUFACTURING CONTROL [J].
BECHTE, W .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (03) :375-395
[4]   Order review and release strategies in a job shop environment: A review and a classification [J].
Bergamaschi, D ;
Cigolini, R ;
Perona, M ;
Portioli, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (02) :399-420
[5]   The workload control concept: theory and practical extensions of Load Oriented Order Release [J].
Breithaupt, JW ;
Land, M ;
Nyhuis, P .
PRODUCTION PLANNING & CONTROL, 2002, 13 (07) :625-638
[6]  
CHENG TCE, 2000, PRODUCTION OPERATION, V9, P283
[7]   Performance analysis of make-to-order manufacturing systems under different workload control regimes [J].
Haskose, A ;
Kingsman, BG ;
Worthington, D .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (02) :169-186
[8]   Semi-interchangeable machines: implications for workload control [J].
Henrich, P. ;
Land, M. J. ;
Gaalman, G. J. C. .
PRODUCTION PLANNING & CONTROL, 2007, 18 (02) :91-104
[9]  
Kelton W.D., 2004, Simulation with Arena, Vthird
[10]   Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis [J].
Kia, H. R. ;
Davoudpour, H. ;
Zandieh, M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (14) :4019-4042