Human factor policy testing in the sequencing of manual mixed model assembly lines

被引:36
作者
Celano, G
Costa, A
Fichera, S
Perrone, G
机构
[1] Univ Catania, Dipartimento Ingn Ind & Meccan, I-95125 Catania, Italy
[2] Univ Basilicata, Dipartimento Ingn & Fis Ambiente, I-85100 Potenza, Italy
关键词
assembly line; human factor; sequencing; conveyor stoppage;
D O I
10.1016/S0305-0548(02)00145-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper the human resource management in manual mixed model assembly U-lines is considered. The objective is to minimise the total conveyor stoppage time to achieve the full efficiency of the line. A model, that includes effects of the human resource, was developed in order to evaluate human factor policies impact on the optimal solution of this line sequencing problem. Different human resource management policies are introduced to cope with the particular layout of the proposed line. Several examples have been proposed to investigate the effects of line dimensions on the proposed management policies. The examples have been solved through a genetic algorithm. The obtained results confirm the effectiveness of the proposed model on the performance optimisation of the line.
引用
收藏
页码:39 / 59
页数:21
相关论文
共 21 条
[11]   Balancing and sequencing manual mixed-model assembly lines [J].
Merengo, C ;
Nava, F ;
Pozzetti, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (12) :2835-2860
[12]   SCHEDULING MIXED-MODEL MULTI-LEVEL JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J ;
SINNAMON, G .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (09) :1487-1509
[13]  
Monden Y., 1998, Toyota Production System - An Integrated Approach to Just-in-Time
[14]   A hybrid GA-SA algorithm for just-in-time scheduling of multi-level assemblies [J].
Roach, A ;
Nagi, R .
COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (04) :1047-1060
[15]   The mixed-model U-line balancing problem [J].
Sparling, D ;
Miltenburg, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (02) :485-501
[16]   A COMPARATIVE-ANALYSIS OF SEQUENCING PROCEDURES FOR MIXED-MODEL ASSEMBLY LINES IN A JUST-IN-TIME PRODUCTION SYSTEM [J].
SUMICHRAST, RT ;
RUSSELL, RS ;
TAYLOR, BW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) :199-214
[17]   MIXED MODEL LINE BALANCING WITH SMOOTHED STATION ASSIGNMENTS [J].
THOMOPOULOS, NT .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (09) :593-603
[18]  
Xiaobo Z., 1997, Computers & Industrial Engineering, V32, P47, DOI 10.1016/S0360-8352(96)00193-3
[19]   SEQUENCING TO MINIMIZE WORK OVERLOAD IN ASSEMBLY LINES WITH PRODUCT OPTIONS [J].
YANO, CA ;
RACHAMADUGU, R .
MANAGEMENT SCIENCE, 1991, 37 (05) :572-586
[20]   Bicriteria sequencing for just-in-time mixed-model assembly lines [J].
Zeramdini, W ;
Aigbedo, H ;
Monden, Y .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (15) :3451-3470