Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers

被引:28
|
作者
Liu, Zhenyuan [1 ,2 ]
Zhang, Yakun [1 ]
Yu, Minghui [1 ,2 ]
Zhou, Xiaolu [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Automat, Wuhan 430074, Hubei, Peoples R China
[2] Minist Image Proc & Intelligent Control, Key Lab Educ, Wuhan 430074, Hubei, Peoples R China
关键词
Ready-mixed concrete; Multiple mixers; Production scheduling; Vehicle dispatching; Conjoint-rule based heuristic algorithm; DELIVERY; SIMULATION; SYSTEM;
D O I
10.1016/j.autcon.2017.08.013
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, the problem of integration of ready-mixed concrete (RMC) production scheduling and truck and pump dispatching in an RMC plant with multiple mixers is focused upon. A time-space network model, which combines RMC production and vehicle dispatching, is proposed. A heuristic algorithm with eight sets of conjoint priority rules for production scheduling, truck and pump dispatching, and mixer scheduling is developed to solve the problem. Computational experiments are conducted on actual cases collected from an RMC company; these cases are classified into four types based on the quantity of orders from construction sites and the discrete degree of construction sites. The advantages and disadvantages of adopting various conjoint-rules in the various types of cases are determined. The experimental results demonstrate that this heuristic solution is capable of enabling managers of RMC plants to develop more suitable schedules in various types of practical cases.
引用
收藏
页码:1 / 13
页数:13
相关论文
共 50 条
  • [31] Management and sustainable utilization of processing wastes from ready-mixed concrete plants in construction: A review
    Xuan, Dongxing
    Poon, Chi Sun
    Zheng, Wei
    RESOURCES CONSERVATION AND RECYCLING, 2018, 136 : 238 - 247
  • [32] Modeling stockout risk and JIT purchasing in ready-mixed concrete batching plants
    Wu, Min
    Shen, Qiping
    Xu, Maozeng
    Wu, Desheng
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (01) : 14 - 19
  • [33] Selection of ready-mixed concrete supplier based on entire process management system
    Wang Guiling
    Ma Minglei
    Miao Dongmei
    Ma Hongjuan
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3028 - 3031
  • [34] Study on application of spontaneous combustion coal gangue aggregate in ready-mixed concrete
    Zhou, Mei
    Li, Gaonian
    Zhang, Qian
    Cui, Hanbo
    Jianzhu Cailiao Xuebao/Journal of Building Materials, 2015, 18 (05): : 830 - 835
  • [35] Influence of Unit Water Content Control on Concrete Performance in the Ready-Mixed Concrete Production Process
    Park, Sang-Hoon
    Ryu, Hwa-Sung
    Park, Won-Jun
    MATERIALS, 2024, 17 (04)
  • [36] Hybridization of very large neighborhood search for ready-mixed concrete delivery problems
    Schmid, Verena
    Doerner, Karl F.
    Hartl, Richard F.
    Salazar-Gonzalez, Juan-Jose
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (03) : 559 - 574
  • [37] Evaluating the communication performance of RFID tags mixed-in and flowing inside ready-mixed concrete
    Fujimoto, S., 1600, Architectural Institute of Japan (19): : 7 - 12
  • [38] Trade-offs in ready-mixed concrete truck scheduling considering stochastic congestion: A novel multi-objective model driven by strength Pareto evolutionary algorithm
    Wang, Wenshun
    Zhang, Yuguo
    Mi, Lingyun
    Guo, Qinglu
    Qiao, Lijie
    Wang, Li
    Tao, Min
    Ma, Jingqun
    COMPUTERS & INDUSTRIAL ENGINEERING, 2025, 203
  • [39] Effective ready mixed concrete supply adjustments with inoperative mixers under stochastic travel times
    Yan, Shangyao
    Wang, Wei-Chung
    Chang, Gong-Wen
    Lin, Han-Chun
    TRANSPORTATION LETTERS-THE INTERNATIONAL JOURNAL OF TRANSPORTATION RESEARCH, 2016, 8 (05): : 286 - 300
  • [40] Production scheduling and truck dispatching of ready mixed concrete
    Yan, Shangyao
    Lai, Weishen
    Chen, Maonan
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (01) : 164 - 179