Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers

被引:28
|
作者
Liu, Zhenyuan [1 ,2 ]
Zhang, Yakun [1 ]
Yu, Minghui [1 ,2 ]
Zhou, Xiaolu [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Automat, Wuhan 430074, Hubei, Peoples R China
[2] Minist Image Proc & Intelligent Control, Key Lab Educ, Wuhan 430074, Hubei, Peoples R China
关键词
Ready-mixed concrete; Multiple mixers; Production scheduling; Vehicle dispatching; Conjoint-rule based heuristic algorithm; DELIVERY; SIMULATION; SYSTEM;
D O I
10.1016/j.autcon.2017.08.013
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, the problem of integration of ready-mixed concrete (RMC) production scheduling and truck and pump dispatching in an RMC plant with multiple mixers is focused upon. A time-space network model, which combines RMC production and vehicle dispatching, is proposed. A heuristic algorithm with eight sets of conjoint priority rules for production scheduling, truck and pump dispatching, and mixer scheduling is developed to solve the problem. Computational experiments are conducted on actual cases collected from an RMC company; these cases are classified into four types based on the quantity of orders from construction sites and the discrete degree of construction sites. The advantages and disadvantages of adopting various conjoint-rules in the various types of cases are determined. The experimental results demonstrate that this heuristic solution is capable of enabling managers of RMC plants to develop more suitable schedules in various types of practical cases.
引用
收藏
页码:1 / 13
页数:13
相关论文
共 50 条
  • [1] Integrated scheduling of ready-mixed concrete production and delivery
    Liu, Zhenyuan
    Zhang, Yang
    Li, Menglei
    AUTOMATION IN CONSTRUCTION, 2014, 48 : 31 - 43
  • [2] A collaborative scheduling model for production and transportation of ready-mixed concrete
    Yin, Jing
    Huang, Ran
    Sun, Hao
    Lin, Taosheng
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2023, 20 (04) : 7387 - 7406
  • [3] Modelling and solving for ready-mixed concrete scheduling problems with time dependence
    Zhang, Guo-Chen
    Zeng, Jian-Chao
    INTERNATIONAL JOURNAL OF COMPUTING SCIENCE AND MATHEMATICS, 2013, 4 (02) : 163 - 175
  • [4] RMCSIM: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers
    Tang, S. L.
    Ying, K. C.
    Anson, M.
    Lu, M.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (01) : 15 - 32
  • [5] A survey of ready-mixed concrete in Shimane
    Wami H.
    Adachi J.
    AIJ Journal of Technology and Design, 2010, 16 (32) : 1 - 4
  • [6] Effect of sludge water from ready-mixed concrete plant on properties and durability of concrete
    Chatveera, B.
    Lertwattanaruk, P.
    Makul, N.
    CEMENT & CONCRETE COMPOSITES, 2006, 28 (05) : 441 - 450
  • [7] Quality control of ready-mixed concrete in Japan
    Nagataki, S.
    Wu, C.
    Proceedings of the 6th International Symposium on Cement & Concrete and CANMET/ACI International Symposium on Concrete Technology for Sustainable Development, Vols 1 and 2, 2006, : 799 - 806
  • [8] Integrated Scheduling in Ready Mixed Concrete Plant with Multi-mixer
    Zhang, Yakun
    Guo, Hua
    2015 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS), 2015,
  • [9] Fresh ready-mixed concrete waste in construction projects: a planning approach
    Kazaz, Aynur
    Ulubeyli, Serdar
    Er, Bayram
    Arslan, Volkan
    Arslan, Ahmet
    Atici, Murat
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 268 - 275
  • [10] Statistical analysis of Portuguese ready-mixed concrete production
    Pacheco, Joao Nuno
    de Brito, Jorge
    Chastre, Carlos
    Evangelista, Luis
    CONSTRUCTION AND BUILDING MATERIALS, 2019, 209 : 283 - 294