Studies on parallel seismic testing for integrity of cemented soil columns

被引:10
作者
Huang Da-zhi [1 ]
Chen Long-zhu [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Civil Engn, Inst Engn Safety & Disaster Prevent, Shanghai 200240, Peoples R China
来源
JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A | 2007年 / 8卷 / 11期
基金
中国国家自然科学基金;
关键词
parallel seismic (PS) testing; cemented soil columns; integrity testing; numerical simulation;
D O I
10.1631/jzus.2007.A1746
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The principle and process of parallel seismic (PS) testing for the integrity testing of cemented soil columns are introduced in this paper. A three-dimensional (3D) finite element model (FEM) for the pile-soil system is established for impulse responses. Under saturated soil or unsaturated soil condition, several vibrating velocity-time histories at different depths in parallel hole are obtained based on the numerical simulation. It shows that the length of the pile and the one-dimensional (1D) P-wave velocity in the pile can be determined easily from the features of the mentioned velocity-time histories. By examining the slopes of the first arrival time plotted versus depth or the depth where the amplitude of the first arrival significantly decreases, the length of the pile can be determined. The effects of the 3D P-wave propagation through the saturated soil and the defect of the cemented soil column on the velocity-time histories are also investigated.
引用
收藏
页码:1746 / 1753
页数:8
相关论文
共 11 条
[1]  
[Anonymous], 2005, DYNAMICS STRUCTURES
[2]   Low strain integrity testing of piles: Three-dimensional effects [J].
Chow, YK ;
Phoon, KK ;
Chow, WF ;
Wong, KY .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2003, 129 (11) :1057-1062
[3]  
Davis A.G., 1995, J. Perform. Constr. Facil, V9, P57, DOI [10.1061/(ASCE)0887-3828(1995)9:1(57), DOI 10.1061/(ASCE)0887-3828(1995)9:1(57)]
[4]  
DAVIS AG, 1993, EVALUATON INTEGRITY
[5]  
Davis AG, 1997, Journal of performance of constructed facilities, V11, P161
[6]  
Finno RJ, 1997, PARALLEL SEISMIC EVA
[7]  
HUANG J, 2006, P GEOC ASCE ATL
[8]   Time domain dynamic analysis of piles under impact loading [J].
Küçükarslan, S .
SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2002, 22 (02) :97-104
[9]  
*OEI, 2006, PS METH
[10]   Borehole NDT techniques for unknown subsurface bridge foundation testing [J].
Olson, LD ;
Liu, M ;
Aouad, MF .
NONDESTRUCTIVE EVALUATION OF BRIDGES AND HIGHWAYS, 1996, 2946 :10-16