Developing the R-TOPSIS methodology for risk-based preventive maintenance planning: A case study in rolling mill company

被引:73
作者
Seiti, Hamidreza [1 ]
Hafezalkotob, Ashkan [2 ]
机构
[1] Islamic Azad Univ, Dept Ind Engn, Sci & Res Branch, Tehran, Iran
[2] Islamic Azad Univ, Dept Ind Engn, South Tehran Branch, Tehran, Iran
关键词
Preventive maintenance planning; R-TOPSIS; Fuzzy reliability; Positive risk; Negative risk; Acceptable risk; MULTICRITERIA DECISION-MAKING; DELAY-TIME MODEL; INSPECTION INTERVALS; RELIABILITY-ANALYSIS; STRATEGY SELECTION; FUZZY TOPSIS; UNCERTAINTY; FRAMEWORK;
D O I
10.1016/j.cie.2019.01.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The importance of day-to-day maintenance has increased because it plays a vital role in maintaining and improving the availability, product quality, safety requirements, and low costs for organizations. There are numerous ways to plan and decide on the maintenance problems, where multi-criteria decision making is one of the fundamental tools. However, in many organizations, especially where information about the likelihood of equipment failure is low, the use of quantitative models is not feasible. Furthermore, because of the dynamic nature of maintenance and the existence of unpredicted or unplanned factors of the equipment reliability, planning the tasks becomes more difficult. Hence, this paper presents a novel fuzzy model to express fuzzy reliability and takes into consideration the risk and error of taking possible influential factors. Moreover, new concepts, such as positive and negative risks, positive and negative acceptable risks, and risk-based TOPSIS methodology for preventive maintenance planning in a multi-period time horizon, have been developed. To illustrate the effectiveness of the proposed model, a real case study is presented for one of the strategic units in a rolling mill company.
引用
收藏
页码:622 / 636
页数:15
相关论文
共 42 条
[1]   A Modeling Framework for Maintenance Optimization of Electrical Components Based on Fuzzy Logic and Effective Age [J].
Baraldi, P. ;
Balestrero, A. ;
Compare, M. ;
Benetrix, L. ;
Despujols, A. ;
Zio, E. .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2013, 29 (03) :385-405
[2]  
Baraldi P, 2013, P I MECH ENG O-J RIS, V227, P267, DOI [10.1177/1748006X13488479, 10.1177/1748006x13488479]
[3]  
Ben-Daya M., 2016, INTRO MAINTENANCE EN, P51
[4]  
Ben-Daya M., 2016, INTRO MAINTENANCE EN, P331
[5]   The analytic hierarchy process applied to maintenance strategy selection [J].
Bevilacqua, M ;
Braglia, M .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2000, 70 (01) :71-83
[6]   Network level bridges maintenance planning using Multi-Attribute Utility Theory [J].
Bukhsh, Zaharah Allah ;
Stipanovic, Irina ;
Klanker, Giel ;
O' Connor, Alan ;
Doree, Andre G. .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2019, 15 (07) :872-885
[7]   An integrated framework for mode failure analysis, delay time model and multi-criteria decision-making for determination of inspection intervals in complex systems [J].
da Silva, Julianna Gomes ;
Lopes, Rodrigo Sampaio .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2018, 51 :17-28
[8]   A MCDM model for preventive maintenance on wells for water distribution [J].
da Silva Monte, Madson Bruno ;
de Almeida Filho, Adiel Teixeira .
2015 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC 2015): BIG DATA ANALYTICS FOR HUMAN-CENTRIC SYSTEMS, 2015, :268-272
[9]  
de Almeida A. T., 2016, MULTICRITERIA MULTIO, P115
[10]   A review of the use of multicriteria and multi-objective models in maintenance and reliability [J].
de Almeida, Adiel Teixeira ;
Pires Ferreira, Rodrigo Jose ;
Cavalcante, Cristiano Alexandre V. .
IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2015, 26 (03) :249-271