A three-layer chromosome genetic algorithm for multi-cell scheduling with flexible routes and machine sharing

被引:38
作者
Feng, Yanling [1 ]
Li, Guo [2 ,3 ,4 ,5 ]
Sethi, Suresh P. [5 ]
机构
[1] Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China
[2] Beijing Inst Technol, Sch Management & Econ, Beijing 100081, Peoples R China
[3] Beijing Inst Technol, Ctr Energy & Environm Policy Res, Beijing 100081, Peoples R China
[4] Sustainable Dev Res Inst Econ & Soc Beijing, Beijing 100081, Peoples R China
[5] Univ Texas Dallas, Naveen Jindal Sch Management, Dallas, TX 75080 USA
基金
中国国家自然科学基金;
关键词
Dynamic cellular manufacturing; Inter-cell movement; Bi-objective programming; Three-layer chromosome genetic algorithm; Machine sharing; CELLULAR MANUFACTURING SYSTEM; HYBRID HARMONY SEARCH; JOB-SHOP; INTERCELL MOVES; PARTS; DESIGN; OPTIMIZATION; MAKESPAN; CELLS; MODEL;
D O I
10.1016/j.ijpe.2017.12.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Alternative machines assignment, machine sharing, and inter-cell movements are very common yet difficult to be solved integratedly in modern dynamic Cellular Manufacturing Systems (CMS). In this paper, we incorporate these issues and consider a dynamic cellular scheduling problem with flexible routes and machine sharing. We employ a mixed integer programming scheduling model to minimize both the makespan and the total workload. To solve this new model, we propose a three-layer chromosome genetic algorithm (TCGA). We first compare the performances of the proposed TCGA with the optimal solution obtained by CPLEX. Computational results show that the TCGA performs well within a reasonable amount of time. We further compare our proposed TCGA with the classic genetic algorithm (GA) and the shortest processing time (SPT) rule through numerical experiments. The results reveal that the TCGA significantly improves the performance and effectively balances the workload of machines.
引用
收藏
页码:269 / 283
页数:15
相关论文
共 42 条
[21]   Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search [J].
Li, Yazhi ;
Li, Xiaoping ;
Gupta, Jatinder N. D. .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (03) :1409-1417
[22]   Roulette-wheel selection via stochastic acceptance [J].
Lipowski, Adam ;
Lipowska, Dorota .
PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2012, 391 (06) :2193-2196
[23]   Solving cell formation and task scheduling in cellular manufacturing system by discrete bacteria foraging algorithm [J].
Liu, Chunfeng ;
Wang, Jufeng ;
Leung, Joseph Y. -T. ;
Li, Kai .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (03) :923-944
[24]   A multi-objective genetic algorithm for optimisation of energy consumption and shop floor production performance [J].
Liu, Ying ;
Dong, Haibo ;
Lohse, Niels ;
Petrovic, Sanja .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 179 :259-272
[25]   A bi-objective model in sustainable dynamic cell formation problem with skill-based worker assignment [J].
Niakan, Farzad ;
Baboli, Armand ;
Moyaux, Thierry ;
Botta-Genoulaz, Valerie .
JOURNAL OF MANUFACTURING SYSTEMS, 2016, 38 :46-62
[26]   Development of a comprehensive model and BFO algorithm for a dynamic cellular manufacturing system [J].
Nouri, Hossein .
APPLIED MATHEMATICAL MODELLING, 2016, 40 (02) :1514-1531
[27]   Improving differential evolution through a unified approach [J].
Padhye, Nikhil ;
Bhardawaj, Piyush ;
Deb, Kalyanmoy .
JOURNAL OF GLOBAL OPTIMIZATION, 2013, 55 (04) :771-799
[28]   An approach to regulating machine sharing in reconfigurable back-end semiconductor manufacturing [J].
Qiu, RG ;
Joshi, S ;
McDonnell, P .
JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (05) :579-591
[29]   An AIS-based hybrid algorithm with PDRs for multi-objective dynamic online job shop scheduling problem [J].
Qiu, Xueni ;
Lau, Henry Y. K. .
APPLIED SOFT COMPUTING, 2013, 13 (03) :1340-1351
[30]   Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships [J].
Rossi, Andrea .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 153 :253-267