Probabilistic criteria for power system expansion planning

被引:14
作者
Manso, LAF [1 ]
da Silva, AML [1 ]
机构
[1] Univ Fed Itajuba, Fed Univ, Inst Elect Engn, Itajuba, MG, Brazil
关键词
generation and transmission planning; Monte Carlo simulation; reliability worth; composite reliability;
D O I
10.1016/j.epsr.2003.07.009
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a new methodology to power system expansion planning using probabilistic criteria. A selecting process for capturing the best expansion alternatives is proposed bearing in mind the application of different reliability evaluating models, which follow a hierarchical procedure. The state. enumeration technique and the non-sequential Monte Carlo simulation are utilized basically as filters. The pseudo-chronological Monte Carlo simulation is then used to evaluate, in detail, the expansion, costs of the previously selected alternatives. The major contribution is to show how traditional procedures and criteria should be adapted to the new competitive environment, where the minimum cost expansion planning has to be achieved considering the reliability worth. An expansion study of the MRTS-modified IEEE reliability system is carried out in order to demonstrate the efficiency of the proposed methodology. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:51 / 58
页数:8
相关论文
共 16 条
[1]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]   MONTE-CARLO APPROACH IN PLANNING STUDIES - AN APPLICATION TO IEEE RTS [J].
BERTOLDI, O ;
SALVADERI, L ;
SCALCINO, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) :1146-1154
[3]   Capacity reserve assessment using system well-being analysis [J].
Billinton, R ;
Karki, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) :433-438
[4]  
BILLINTON R, 1990, 90EH03111PWR IEEE TU
[5]   OPTIMAL MULTIOBJECTIVE VAR PLANNING USING AN INTERACTIVE SATISFYING METHOD [J].
CHEN, YL ;
LIU, CC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) :664-670
[6]  
*COOP LYBR, 1997, RESTR PROJ EL BRAZ S
[7]   Pseudo-chronological simulation for composite reliability analysis with time varying loads [J].
da Silva, AML ;
Manso, LAD ;
Mello, JCD ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (01) :73-80
[8]  
*EPRI, 1989, RP2810 EPRI
[9]  
LEITE DA, 1997, INT J ELECT POWER SY, V41, P109
[10]  
LEITEDASILVA AM, 1999, 13 PSCC POW SYST COM, V1, P187