A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency

被引:0
作者
Zhu, Chong [1 ]
Xue, Yuan [1 ]
He, Zhijie [1 ]
Bao, Zhenqiang [1 ]
Zhang, Zhaoyue [1 ]
Hu, Kaixuan [1 ]
机构
[1] Yangzhou Univ, Dept Informat Engn, Yangzhou, Jiangsu, Peoples R China
来源
PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019) | 2019年
关键词
Multi-skill Project Scheduling Problem; multi-objective model; human resource management; perform efficiency; improved NSGA-II algorithm; ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The growing need of responsiveness for enterprises facing market volatility raises a strong demand for flexibility in their human resource management. This paper presents a multi-objective model for Multi-skill Project Scheduling Problem. We propose a new wage distribution method in which different perform efficiencies of human resources are taken into account. The model aims at minimizing project duration and project costs concurrently. An improved NSGA-II algorithm is designed to solve the model. The algorithm introduces a multi-dimensional chromosome coding scheme to identify the priorities and staff allocation of each activity. Special chromosome crossover and mutation operation are employed to address resource conflicts and constraint violations. Eventually, A case study is presented to verify the efficiency of the proposed approach.
引用
收藏
页码:719 / 724
页数:6
相关论文
共 50 条
  • [31] An interactive multi-objective programming approach for project portfolio selection and scheduling
    Zorluoglu, Ozge Sahin
    Kabak, Ozgur
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [32] Multi-objective Functions in Grid Scheduling
    Azmi, Zafril Rizal M.
    Ameedeen, M. A.
    Kamarudin, Imran Edzereiq
    ADVANCED COMPUTER AND COMMUNICATION ENGINEERING TECHNOLOGY, 2015, 315 : 501 - 524
  • [33] MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH CARBON EMISSIONS
    Zhang, Guo-Hui
    Dang, Shi-Jie
    Deng, Xiang
    ENERGY AND MECHANICAL ENGINEERING, 2016, : 946 - 952
  • [34] Multi-Objective Flexible Job-Shop Scheduling Problem with DIPSO: More Diversity, Greater Efficiency
    Felix Carvalho, Luiz Carlos
    Fernandes, Marcia Aparecida
    2014 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2014, : 282 - 289
  • [35] Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach
    Shahnazari-Shahrezaei, Parisa
    Tavakkoli-Moghaddam, Reza
    Kazemipoor, Hamed
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (07) : 5424 - 5443
  • [36] An Evolutionary Approach for Multi-Objective Optimization in Cyclic Hoist Scheduling Problem
    El Amraoui, Adnen
    Mesghouni, Khaled
    2014 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2014, : 201 - 206
  • [37] A Multi-objective Optimization Approach to Workflow Scheduling in Clouds Considering Fault Recovery
    Xu, Heyang
    Yang, Bo
    Qi, Weiwei
    Ahene, Emmanuel
    KSII TRANSACTIONS ON INTERNET AND INFORMATION SYSTEMS, 2016, 10 (03): : 976 - 995
  • [38] A multi-objective model for the green capacitated location-routing problem considering environmental impact
    Toro, Eliana M.
    Franco, John F.
    Granada Echeverri, Mauricio
    Guimaraes, Frederico Gadelha
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 110 : 114 - 125
  • [39] Multi-Objective Flexible Flow Shop Scheduling Problem Considering Variable Processing Time due to Renewable Energy
    Wu, Xiuli
    Shen, Xianli
    Cui, Qi
    SUSTAINABILITY, 2018, 10 (03):
  • [40] Multi-objective green vehicle scheduling problem considering time window and emission factors in ship block transportation
    Guo, Hui
    Wang, Jucheng
    Sun, Jing
    Mao, Xuezhang
    SCIENTIFIC REPORTS, 2024, 14 (01):