A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency

被引:0
|
作者
Zhu, Chong [1 ]
Xue, Yuan [1 ]
He, Zhijie [1 ]
Bao, Zhenqiang [1 ]
Zhang, Zhaoyue [1 ]
Hu, Kaixuan [1 ]
机构
[1] Yangzhou Univ, Dept Informat Engn, Yangzhou, Jiangsu, Peoples R China
来源
PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019) | 2019年
关键词
Multi-skill Project Scheduling Problem; multi-objective model; human resource management; perform efficiency; improved NSGA-II algorithm; ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The growing need of responsiveness for enterprises facing market volatility raises a strong demand for flexibility in their human resource management. This paper presents a multi-objective model for Multi-skill Project Scheduling Problem. We propose a new wage distribution method in which different perform efficiencies of human resources are taken into account. The model aims at minimizing project duration and project costs concurrently. An improved NSGA-II algorithm is designed to solve the model. The algorithm introduces a multi-dimensional chromosome coding scheme to identify the priorities and staff allocation of each activity. Special chromosome crossover and mutation operation are employed to address resource conflicts and constraint violations. Eventually, A case study is presented to verify the efficiency of the proposed approach.
引用
收藏
页码:719 / 724
页数:6
相关论文
共 50 条
  • [1] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty
    Ghamginzadeh, Arman
    Najafi, Amir Abbas
    Khalilzadeh, Mohammad
    INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2021, 23 (02) : 518 - 534
  • [2] An integrated solution approach for multi-objective, multi-skill workforce scheduling and routing problems
    Cakirgil, Seray
    Yucel, Eda
    Kuyzu, Gultekin
    COMPUTERS & OPERATIONS RESEARCH, 2020, 118
  • [3] Branch-and-price approach for the multi-skill project scheduling problem
    Montoya, Carlos
    Bellenguez-Morineau, Odile
    Pinson, Eric
    Rivreau, David
    OPTIMIZATION LETTERS, 2014, 8 (05) : 1721 - 1734
  • [4] Multi-skill project scheduling with skill evolution and cooperation effectiveness
    Li, Qian
    Sun, Qinshan
    Tao, Sha
    Gao, Xinglin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (08) : 2023 - 2045
  • [5] Priority-based heuristics for the multi-skill resource constrained project scheduling problem
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 57 : 91 - 103
  • [6] A Multi-Objective Dedicated Local Search for Project Scheduling Problem
    Nino, K.
    Mejia, G.
    Amodeo, L.
    IFAC PAPERSONLINE, 2016, 49 (12): : 875 - 880
  • [7] A Novel Multi-Objective Project Portfolio Selection and Scheduling Problem
    Harrison, Kyle Robert
    Elsayed, Saber M.
    Weir, Terence
    Garanovich, Ivan L.
    Boswell, Sharon G.
    Sarker, Ruhul A.
    2022 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2022, : 480 - 487
  • [8] iMOPSE: a library for bicriteria optimization in Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Nikulin, Ivan
    Skowronski, Marek
    SOFT COMPUTING, 2019, 23 (10) : 3397 - 3410
  • [9] Multi-objective optimization model for multi-project scheduling on critical chain
    Wang Wei-xin
    Wang Xu
    Ge Xian-long
    Deng Lei
    ADVANCES IN ENGINEERING SOFTWARE, 2014, 68 : 33 - 39
  • [10] Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach
    Akbar, Saeed
    Zubair, Muhammad
    Khan, Rizwan
    Ul Akbar, Ubaid
    Ullah, Rahmat
    Zheng, Zhonglong
    IEEE ACCESS, 2024, 12 : 29824 - 29836