Integrated lot sizing and safety stock placement in a network of production facilities

被引:20
作者
Kumar, Kunal [1 ]
Aouam, Tarik [1 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
关键词
Lot sizing; Safety stock placement; Congestion; Integration; SUPPLY CHAINS; LEAD TIME; DEMAND; MODEL;
D O I
10.1016/j.ijpe.2017.10.006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In a network of production facilities, safety stock placement is determined at the network level to hedge against uncertainty in demand, while considering the production cycle time (PCT) of each stage as an exogenous parameter. The lot sizing policy at each stage affects setup time, capacity, and is a major determinant of queuing behavior and PCT. This paper integrates strategic safety stock placement and tactical lot sizing, which are typically optimized independently. We model the integrated problem to minimize system-wide production and inventory costs subject to meeting service-level requirements of external customers. We establish bounds for optimal lot sizes and extend existing safety stock placement dynamic programming algorithm to solve the integrated problem. Based on numerical experiments, we assess the value of integrating the two decisions and find that integration leads to smaller lot sizes, shorter lead times, and favors pooling of safety stocks. The setup cost, setup time, and the added value at,a production stage are the most significant factors in determining the amount of savings generated through integration. In addition, simulation studies show that integration reduces PCT variability and decreases the fraction of delayed items.
引用
收藏
页码:74 / 95
页数:22
相关论文
共 32 条
[1]  
[Anonymous], 1981, INT J OPERATIONS PRO
[2]  
Armbruster D., 2012, DECISION POLICIES PR
[3]   Accelerating the profitability of Hewlett-Packards supply chains [J].
Clarke, J .
INTERFACES, 2004, 34 (01) :72-72
[4]   BATCHING TO MINIMIZE FLOW TIMES ON ONE MACHINE [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1987, 33 (06) :784-799
[5]  
Graves S. C., 2000, Manufacturing & Service Operations Management, V2, P68, DOI 10.1287/msom.2.1.68.23267
[6]  
Graves SC, 2003, HDBK OPER R, V11, P95
[7]   Strategic inventory placement in supply chains: Nonstationary demand [J].
Graves, Stephen C. ;
Willems, Sean P. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2008, 10 (02) :278-287
[8]   Strategic Safety-Stock Placement in Supply Chains with Capacity Constraints [J].
Graves, Stephen C. ;
Schoenmeyr, Tor .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2016, 18 (03) :445-460
[9]   A review of techniques for buffering against uncertainty with MRP systems [J].
Guide, VDR ;
Srivastava, R .
PRODUCTION PLANNING & CONTROL, 2000, 11 (03) :223-233
[10]   A Simple, Robust Leadtime-Quoting Policy [J].
Hopp, Wallace J. ;
Sturgis, Melanie Roof .
Manufacturing and Service Operations Management, 2001, 3 (04) :321-336