The application, modification & extension of earned value management in construction projects

被引:0
|
作者
Zhang, Xiaoli [1 ]
Lin, Zefu [1 ]
Ji, Xue [1 ]
机构
[1] Cent Univ Finance & Econ, Sch Management Sci & Engn, Beijing, Peoples R China
关键词
project management; project implementation; control; earned value management; quality control;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The Earned Value Management, as an integrated technique of project monitoring and control, has been increasingly used in managing scope, time and cost, the three key factors for project success. However, it so far has not been extended to assess and monitor quality, which is widely recognized as another key success factor. The goal of this paper is to redefine two of the three major variables used in calculating cost and schedule variances, and to propose a new variable and a new measure-quality variance, on the basis of a discussion of what should be monitored in the project control process and an analysis of EVM's flaws identified in a field study.
引用
收藏
页码:955 / 958
页数:4
相关论文
共 50 条
  • [31] The Application of Improved Earned Value Management Method in Engineering Project Management
    Gao Xiuju
    MOT2009: PROCEEDINGS OF ZHENGZHOU CONFERENCE ON MANAGEMENT OF TECHNOLOGY, VOLS I AND II, 2009, : 383 - 387
  • [32] Increasing earned value analysis efficiency for IT projects
    Stanek, Stanislaw
    Kuchta, Dorota
    JOURNAL OF DECISION SYSTEMS, 2020, 29 (sup1) : 352 - 360
  • [33] Conditions of success for earned value analysis in projects
    Bryde, David
    Unterhitzenberger, Christine
    Joby, Roger
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (03) : 474 - 484
  • [34] Improving Construction Management of an Educational Center by Applying Earned Value Technique
    Naderpour, A.
    Mofid, M.
    PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [35] Integrating BIM and Earned Value Management System to Measure Construction Progress
    Alzraiee, Hani
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION INFORMATION TECHNOLOGY, 2018, : 684 - 693
  • [36] Application of improved earned value method in project management processes
    Qiao, Li-Hong
    Guo, Guang-Xin
    Yang, Zhi-Bing
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2010, 30 (01): : 33 - 36
  • [37] Improvement and application of earned value analysis in coal project management
    Zhong, Shuheng
    Wang, Xin
    ISMSSE 2011, 2011, 26
  • [38] Greenhouse Gas Emissions Management in Prefabrication and Modular Construction Based on Earned Value Management
    Liu, Guiwen
    Huang, Ruopeng
    Li, Kaijian
    Shrestha, Asheem
    Fu, Xinyue
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (06)
  • [39] Project management: Earned value management
    Duncan, B
    TECHNOLOGY OF OBJECT-ORIENTED LANGUAGES AND SYSTEMS - TOOLS 34, PROCEEDINGS, 2000, : 513 - 514
  • [40] Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast
    Urgiles, P.
    Claver, J.
    Sebastian, M. A.
    COMPLEXITY, 2019, 2019