Solving the continuous flow-shop scheduling problem by metaheuristics

被引:94
作者
Fink, A [1 ]
Voss, S [1 ]
机构
[1] Univ Hamburg, Inst Informat Syst, D-20146 Hamburg, Germany
关键词
metaheuristics; heuristics; tabu search; simulated annealing; continuous flow-shop scheduling; time-dependent traveling salesman problem;
D O I
10.1016/S0377-2217(02)00834-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Continuous flow-shop scheduling problems circumscribe an important class of sequencing problems in the field c production planning. The problem considered here is to find a permutation of jobs to be processed sequentially on number of machines under the restriction that the processing of each job has to be continuous with respect to to objective of minimizing the total processing time (flow-time). This problem is NP-hard. We consider the application of different kinds of metaheuristics from a practical point of view, examining the trade-off between running time an, solution quality as well as the knowledge and efforts needed to implement and calibrate the algorithms. Computational results show that high quality results can be obtained in an efficient way by applying metaheuristics software components with neither the need to understand their inner working nor the necessity to manually tune parameters. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:400 / 414
页数:15
相关论文
共 55 条
[41]  
RAJENDRAN C, 1994, J OPER RES SOC, V45, P472, DOI 10.2307/2584218
[42]  
RAJENDRAN C, 1990, NAV RES LOG, V37, P695, DOI 10.1002/1520-6750(199010)37:5<695::AID-NAV3220370508>3.0.CO
[43]  
2-L
[44]   FLOW-SHOP SEQUENCING PROBLEM WITH NO WAIT IN PROCESS [J].
REDDI, SS ;
RAMAMOORTHY, CV .
OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) :323-+
[45]  
Reeves CR., 1993, Modern Heuristic Techniques for Combinatorial Problems
[46]   Flowshop scheduling/sequencing research: A statistical review of the literature, 1952-1994 [J].
Reisman, A ;
Kumar, A ;
Motwani, J .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1997, 44 (03) :316-329
[47]   P-COMPLETE APPROXIMATION PROBLEMS [J].
SAHNI, S ;
GONZALEZ, T .
JOURNAL OF THE ACM, 1976, 23 (03) :555-565
[48]   A NOTE ON THE FLOWSHOP PROBLEM WITHOUT INTERRUPTIONS IN JOB PROCESSING [J].
SZWARC, W .
NAVAL RESEARCH LOGISTICS, 1981, 28 (04) :665-669
[49]   BENCHMARKS FOR BASIC SCHEDULING PROBLEMS [J].
TAILLARD, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) :278-285
[50]  
van Deman JM, 1974, AIIE T, V6, P28, DOI DOI 10.1080/05695557408974929