Precast tunnel segments for metro tunnel lining: A hybrid reinforcement solution using macro-synthetic fibers

被引:45
作者
Conforti, Antonio [1 ]
Trabucchi, Ivan [1 ]
Tiberti, Giuseppe [1 ]
Plizzari, Giovanni A. [1 ]
Caratelli, Angelo [2 ]
Meda, Alberto [2 ]
机构
[1] Univ Brescia, Dept Civil Environm Architectural Engn & Math, Brescia, Italy
[2] Univ Roma Tor Vergata, Dept Civil Engn, Rome, Italy
关键词
Fiber reinforced concrete; Hybrid reinforcement; Macro-synthetic fibers; Metro tunnel lining; Precast tunnel segments; CONCRETE; DESIGN;
D O I
10.1016/j.engstruct.2019.109628
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The addition of fibers has been proven successful to simplify reinforcement in precast tunnel segments, allowing as a function of both segment typology and fiber reinforced concrete (FRC) toughness a total or partial replacement of the conventional reinforcement. Results from an experimental research aimed at comparing the structural behavior of segments made with conventional (only rebars, RC) or hybrid (rebars + fibers) reinforcement are presented. The experimental program consisted of flexural and point load tests (which reproduces the jack actions during TBM operations) carried out on four large-scale precast tunnel segments representative of a metro tunnel lining characterized by an internal diameter of 5.80 m and a thickness of 0.30 m. The main goal of the experimental program was to evaluate the possibility of using macro-synthetic polypropylene fibers (Polypropylene Fiber Reinforced Concrete, PFRC) in combination with a lower amount of conventional rebars (optimized reinforcement, RCO) for guaranteeing the required segment performance. Experimental results indicate that macro-synthetic fibers may be very effective in combination with conventional rebars to withstand the main stresses that arise in a segment both at initial and final phases, proving that the adoption of hybrid reinforcement solution using macro-synthetic fiber is possible for metro tunnel lining.
引用
收藏
页数:11
相关论文
共 33 条
[21]  
Ernst & Young LLP, 2013, FN0016 EYG, P1
[22]  
Eurocode 2, 2004, DESIGN CONCRETE STRU
[23]  
Hilar M., 2012, CZECH SLOVAK ITA AIT, V3, P30
[24]  
ITA, 2016, 16 ITA, P1
[25]  
Iyengar K.T.S.R., 1962, J AM CONCRETE I, V59, P1443, DOI [10.14359/7961, DOI 10.14359/7961]
[26]   Lining design for the district heating tunnel in Copenhagen with steel fibre reinforced concrete segments [J].
Kasper, Thomas ;
Edvardsen, Carola ;
Wittneben, Gert ;
Neumann, Dieter .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2008, 23 (05) :574-587
[27]   Experimental investigation on precast tunnel segments under TBM thrust action [J].
Meda, Alberto ;
Rinaldi, Zila ;
Caratelli, Angelo ;
Cignitti, Filippo .
ENGINEERING STRUCTURES, 2016, 119 :174-185
[28]   Structural effects of FRC creep [J].
Plizzari, Giovanni ;
Serna, Pedro .
MATERIALS AND STRUCTURES, 2018, 51 (06)
[29]  
Schumacher P., 2006, THESIS
[30]  
Tiberti G, P INT FIB S 2008 TAI, DOI [10.1201/9781439828410.ch37, DOI 10.1201/9781439828410.CH37]