Information systems implementation failure: Insights from prism

被引:45
作者
Pan, Gary [2 ]
Hackney, Ray [1 ]
Pan, Shan L. [3 ]
机构
[1] Brunel Univ, Uxbridge UB8 3PH, Middx, England
[2] Singapore Management Univ, Singapore 178900, Singapore
[3] Natl Univ Singapore, Singapore 117548, Singapore
关键词
IS implementation; ERP; failure; process; structured case analysis;
D O I
10.1016/j.ijinfomgt.2007.07.001
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
This paper develops a theoretical framework and empirical formulation for describing and analyzing the information systems (IS) implementation process. Here, the sequential mapping of project events is integrated with the 'Exchange Relations' model of IS failure that identifies evolving recursive interactions. Three major IS implementation components are considered: the project organization, the information system and its supporters. Our model, referred to as process recursive interactive systems model (PRISM), demonstrates antecedent conditions, critical events and outcomes over the course of an IS implementation project lifecycle. It acts as a theoretical lens to make sense of the process where analysts may utilize PRISM in post-mortem analyses to diagnose the issues surrounding IS development and devise useful management strategies for any future system implementation. PRISM is formulated and illustrated within a structured case study of implementing an enterprise resource planning system (ERP) project. The contribution of the research is to enable formal analysis of critical incidents and their relations between preceding events and consequences which provide insights into potential project success or failure. It is believed that the findings will be of benefit to both academics and practitioners engaged in the complexities of ERP implementation. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:259 / 269
页数:11
相关论文
共 36 条
[1]  
[Anonymous], 1996, ESCALATION DECISION
[2]  
[Anonymous], INFORM TECHNOL PEOPL
[3]   Information systems 'failure': The case of the London ambulance service's computer aided despatch project [J].
BeynonDavies, P .
EUROPEAN JOURNAL OF INFORMATION SYSTEMS, 1995, 4 (03) :171-184
[4]   Doomed to failure: Narratives of inevitability and conspiracy in a failed IS project [J].
Brown, AD ;
Jones, MR .
ORGANIZATION STUDIES, 1998, 19 (01) :73-88
[5]  
Carroll JM, 2000, EUR J INFORM SYST, V9, P235, DOI 10.1057/palgrave/ejis/3000374
[6]  
CIBORRA CU, 2000, CONTROL DRIFT
[7]  
Devadoss P, 2007, COMMUN ASSOC INF SYS, V19, P352
[8]   What we never have, we never miss? Decision error and the risks of premature termination [J].
Drummond, H .
JOURNAL OF INFORMATION TECHNOLOGY, 2005, 20 (03) :170-176
[9]   Critical issues in abandoned information systems development projects [J].
EwusiMensah, K .
COMMUNICATIONS OF THE ACM, 1997, 40 (09) :74-80
[10]   The turnaround of the London Ambulance Service Computer-Aided Despatch system (LASCAD) [J].
Fitzgerald, G ;
Russo, NL .
EUROPEAN JOURNAL OF INFORMATION SYSTEMS, 2005, 14 (03) :244-257