Accounting for flexibility in power system planning with renewables

被引:76
作者
Belderbos, Andreas [1 ]
Delarue, Erik [1 ]
机构
[1] Univ Louvain, Katholieke Univ Leuven, Energy Inst, TME Branch Appl Mech & Energy Convers, Celestijnenlaan 300A,Box 2421, B-3001 Louvain, Belgium
基金
比利时弗兰德研究基金会;
关键词
Power system planning; Renewables; Screening curve; Unit commitment; Wind power; UNIT COMMITMENT; WIND POWER; GENERATION; ENERGY; MODEL; DYNAMICS; IMPACT;
D O I
10.1016/j.ijepes.2015.02.033
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Due to the increasing deployment of intermittent renewables, the residual load profile, as seen by the dispatchable generation units, becomes lower and more volatile. This paper introduces a new system planning model on a power plant resolution, taking into account technical operational constraints. The objective of this model is to determine the optimal set of generation units, able to serve a given demand. Two initial solutions are obtained; one from a classical screening curve model, and another from a model using mixed integer linear programming (MILP). These initial solutions are perturbed and combined with an operational model to validate and further improve the solution. The developed model complements other models available from the literature, in its level of detail (power plant level and full year - hourly time resolution) combined with a fast computation time (<1 h). The evolution of the optimal amount of generation capacity as a function of the installed wind capacity is examined in a case study. As the share of wind power increases in the portfolio, a shift takes place from base load generation towards mid and peak load. This shift is triggered both by the lower demand and the increasing volatility. This demonstrates that operational constraints of power plants (individual basis) have an important impact on the configuration of the optimal generator set, and need being considered, especially at increasing rates of intermittent renewables. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:33 / 41
页数:9
相关论文
共 35 条
[1]   A dynamic model for coordination of generation and transmission expansion planning in power systems [J].
Alizadeh, Behnam ;
Jadid, Shahram .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 65 :408-418
[2]  
[Anonymous], GRID DATA DEMAND
[3]  
[Anonymous], P 17 POW SYST COMP C
[4]  
[Anonymous], 2010, Projected Costs of Generating Electricity
[5]  
[Anonymous], P 2011 IEEE POW EN S
[6]  
[Anonymous], GRID DATA INJECTED P
[7]  
[Anonymous], 2002, POWER SYSTEM EC
[8]  
[Anonymous], 2011, NRELTP6A2046534
[9]   A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem [J].
Carrion, Miguel ;
Arroyo, Jose M. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) :1371-1378
[10]   Determining optimal electricity technology mix with high level of wind power penetration [J].
De Jonghe, Cedric ;
Delarue, Erik ;
Belmans, Ronnie ;
D'haeseleer, William .
APPLIED ENERGY, 2011, 88 (06) :2231-2238