Reliability Effects of Maintenance on TNEP Considering Preventive and Corrective Repairs

被引:21
作者
Mahdavi, Meisam [1 ]
Monsef, Hassan [1 ]
Romero, Ruben [2 ]
机构
[1] Univ Tehran, Sch Elect & Comp Engn, Coll Engn, Res Ctr Power Syst Operat & Planning Studies, Tehran 14395515, Iran
[2] Univ Estadual Paulista, Fac Engn Ilha Solteira, Dept Elect Engn, Ilha Solteira CP 31, Sao Paulo, SP, Brazil
关键词
Corrective and preventive repairs; forced and planned outages; line loading; line maintenance; TNEP; NETWORK LOSSES; EXPANSION; PARAMETERS;
D O I
10.1109/TPWRS.2016.2640178
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The aim of this paper is to investigate maintenance effects on system reliability and transmission network expansion planning considering line loading and repairs. For this purpose, the maintenance cost is formulated taking into account transient and permanent forced outage rates, as well as durations of planned and forced outage. Also, transmission reliability is modeled considering load shedding (LS) and energy not supplied (ENS) criteria. LS index is calculated for transient forced outages and ENS criterion is computed for permanent forced outages, and planned outage rates and durations. Furthermore, the effects of line loadings on transmission system reliability are formulated through the transient and permanent forced outage rates. The proposed model was tested on the IEEE 24-bus and 30-bus test systems, and the results are discussed.
引用
收藏
页码:3768 / 3781
页数:14
相关论文
共 23 条
[1]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[2]   A greedy randomized adaptive search procedure for transmission expansion planning [J].
Binato, S ;
de Oliveira, GC ;
de Araújo, JL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (02) :247-253
[3]  
Buygi M. O., 2004, THESIS
[4]   Probabilistic reliability criterion for planning transmission system expansions [J].
Choi, J. ;
Mount, T. D. ;
Thomas, R. J. ;
Billinton, R. .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) :719-727
[5]  
Choi J, 2006, 39 HAW INT C SYST SC, V10, P1
[6]   A multi-objective framework for dynamic transmission expansion planning in competitive electricity market [J].
Foroud, Asghar Akbari ;
Abdoos, Ali Akbar ;
Keypour, Reza ;
Amirahmadi, Meisam .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2010, 32 (08) :861-872
[7]   Parallel simulated annealing applied to long term transmission network expansion planning [J].
Gallego, RA ;
Alves, AB ;
Monticelli, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1997, 12 (01) :181-186
[8]   TRANSMISSION NETWORK ESTIMATION USING LINEAR PROGRAMMING [J].
GARVER, LL .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1970, PA89 (07) :1688-&
[9]   Congestion management based roulette wheel simulation for optimal capacity selection: Probabilistic transmission expansion planning [J].
Gupta, Neeraj ;
Shekhar, Rajiv ;
Kalra, Prem Kumar .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 43 (01) :1259-1266
[10]   The effect of transformer maintenance parameters on reliability and cost: a probabilistic model [J].
Jirutitijaroen, P ;
Singh, C .
ELECTRIC POWER SYSTEMS RESEARCH, 2004, 72 (03) :213-224