Estimating service lives using the factor method for use in whole life costing

被引:0
作者
Bourke, K
Davies, H
机构
来源
DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS | 1999年
关键词
factor method; service life estimates; whole life costs; standards; construction procurement; risk;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Construction projects have traditionally been costed on the basis of the initial capital cost. The privatisation of many infrastructure providers, the use of private equity to finance construction projects for the public sector and ever-tighter constraints on public spending have generated demands in the UK to predict the overall cost of a project over its whole working life. This concern extends to demands for predictable building service lives and costs of ownership. Until very recently there have been no standard methodologies for approaching this problem. This paper explores the concepts included in whole life costing, in particular that of factored estimates of service life, and reports on the current commercial and practical issues driving adoption of whole life cost procurement of construction works.
引用
收藏
页码:1518 / 1526
页数:3
相关论文
共 10 条
[1]  
*AIJ, 1993, PRINC GUID SERV LIF
[2]  
BOURKE K, 1997, 320 CRC LTD BRE LAB
[3]  
*BSI, 1993, BS3811 BSI
[4]  
*CAL, 1992, HAPM COMP LIF MAN
[5]  
*CCF, 1998, CONSTR CLIENTS FOR
[6]  
*CRT, 1997, AG CHANG
[7]  
HED G, 1998, P CIB WORLD BUILD C
[8]  
HELLER J, 1968, CATCH 22
[9]  
HOVDE P, 1998, P CIB WORLD BUILD C
[10]  
Seeley I.H., 1996, BUILDING EC