Design production and first commissioning results of tbe electrical feedboxes of the LHC

被引:0
|
作者
Perin, A. [1 ]
Atieh, S. [1 ]
Benda, V. [1 ]
Bertarelli, A. [1 ]
Bouillot, A. [1 ]
Brodzinski, K. [3 ]
Folch, R. [1 ]
Fydrych, J. [3 ]
Genet, M. [1 ]
Koczorowski, S. [1 ]
Metral, L. [1 ]
Miles, J. [1 ]
Millet, F. [1 ]
Polkovnikov, K. [2 ]
Rabehl, R. [4 ]
Serio, L. [1 ]
Sytchev, V. [2 ]
Sytnik, V. [2 ]
Trilhe, P. [1 ]
van Weelderen, R. [1 ]
Zhabitskiy, V. [2 ]
机构
[1] CERN, European Org Nucl Res, CH-1211 Geneva, Switzerland
[2] Inst High Energy, Moscow 142281, Russia
[3] Wroclaw Univ Technol, PL-50370 Wroclaw, Poland
[4] Fermilab Natl Accelerator Lab, Batavia, IL 60510 USA
关键词
electrical feedbox; HTS current leads; superconductor; busbar; LHC;
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
A total of 44 CERN designed cryogenic electrical feedboxes are needed to power the LHC superconducting magnets. The feedboxes include more than 1000 superconducting circuits fed by high temperature superconductor and conventional current leads ranging from 120 A to 13 kA. In addition to providing the electrical current to the superconducting circuits, they also ensure specific mechanical and cryogenic functions for the LHC. The paper focuses on the main design aspects and related production operations and gives an overview of specific technologies employed. Results of the commissioning of the feedboxes of the first LHC sectors are presented.
引用
收藏
页码:747 / +
页数:2
相关论文
共 50 条
  • [1] Conceptual design of the cryogenic electrical feedboxes and the superconducting links of LHC
    Goiffon, T.
    Lyngaa, J.
    Metral, L.
    Perin, A.
    Trilhe, P.
    van Weelderen, R.
    ICEC 20: PROCEEDINGS OF THE TWENTIETH INTERNATIONAL CRYOGENIC ENGINEERING CONFERENCE, 2005, : 1059 - 1062
  • [2] Muon commissioning and Exclusive B production at CMS with the first LHC data
    Taroni, S.
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2011, 210-11 : 21 - 24
  • [3] Commissioning of the LHC Injectors Upgrade fast wire scanners and first experimental results
    Di Carlo, S.
    Emery, J.
    Andreazza, W.
    Belohrad, D.
    Felipe, J. C. Esteban
    Goldblatt, A.
    Gudkov, D.
    Guerrero, A.
    Jackson, S.
    Lacarrere, G. O.
    Nieto, M. Martin
    Rinaldi, A. T.
    Roncarolo, F.
    Schillinger, C.
    Veness, R.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2023, 1053
  • [4] STRATEGY FOR THE FIRST TWO MONTHS OF LHC BEAM COMMISSIONING (COMMISSIONING TO FIRST STABLE BEAMS)
    Redaelli, S.
    Arduini, G.
    Giovannozzi, M.
    Lamont, M.
    Tomas, R.
    Wenninger, J.
    CHAMONIX 2014: WORKSHOP ON LHC PERFORMANCE, 2015, : 125 - 128
  • [5] Commissioning the cryogenic system of the first LHC sector
    Millet, F.
    Claudet, S.
    Ferlin, G.
    Perin, A.
    Rabehl, R.
    Riddone, G.
    Ronayette, L.
    Serio, L.
    Soubiran, M.
    Tavian, L.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 53A AND 53B, 2008, 985 : 1403 - +
  • [6] LHCb vertex locator commissioning and results from the first LHC beam reconstructed tracks
    Borghi, Silvia
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 623 (01): : 156 - 158
  • [7] Calibration, testing, commissioning and first data of ALFA at LHC
    Jakobsen, Sune
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2012, 695 : 342 - 346
  • [8] FIRST RESULTS ON CHARGED PARTICLE PRODUCTION IN ALICE EXPERIMENT AT LHC
    Kowalski, Marek
    ACTA PHYSICA POLONICA B, 2011, 42 (3-4): : 859 - 866
  • [9] Commissioning MATISSE: first results
    Petrov, Romain G.
    Allouche, Fatme
    Berio, Philippe
    Chelli, Alain
    Cruzalebes, Pierre
    Fantei, Yan
    Jaffe, Walter
    Glindemann, Andreas
    Lagarde, Stephane
    Lopez, Bruno
    Matter, Alexis
    Meilland, Antony
    Millour, Florentin
    Morel, Sebastien
    Paladini, Claudia
    Rivinius, Thomas
    Robbe-Dubois, Sylvie
    Rousseau, Sylvain
    Schoeller, Markus
    Varga, Jozsef
    Zins, Gerard
    OPTICAL AND INFRARED INTERFEROMETRY AND IMAGING VI, 2018, 10701
  • [10] Commissioning of the ATLAS detector with cosmic rays and first LHC beams
    Costa, M. J.
    DISCRETE 08: SYMPOSIUM ON PROSPECTS IN THE PHYSICS OF DISCRETE SYMMETRIES, 2009, 171