Auditing Construction Cost from an In-Process Perspective Based on a Bayesian Predictive Model

被引:5
作者
Wang, Peipei [1 ]
Wang, Kun [2 ]
Huang, Yunhan [1 ]
Fenn, Peter [2 ]
Stewart, Ian [2 ]
机构
[1] Jiangsu Ocean Univ, Sch Civil & Ocean Engn, Lianyungang 222000, Peoples R China
[2] Univ Manchester, Sch Mech Aerosp & Civil Engn, Manchester M13 9PL, Lancs, England
关键词
Cost overrun; In-process audit; Prediction; Construction projects; Bayesian belief network; CRITICAL SUCCESS FACTORS; DELAY FACTORS; RISK ANALYSIS; PROJECTS; OVERRUN; TIME; IDENTIFICATION;
D O I
10.1061/(ASCE)CO.1943-7862.0002253
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional audit process in construction cost control usually occurs passively at the end of a project life cycle. This calls for a predictive model that provides a framework assembling essential information and predicts construction cost overrun potential during project processes. Unlike previous mechanistic models that reflect the full formation mechanism, the model established in this paper features a fragmentary formation mechanism consisting of shortlisted critical factors. Factors were shortlisted by both theoretical and statistical criticality to construction cost overrun, dictating the factors to pass the initial literature review identification, expert opinion verification, and Pearson's chi-square tests of interdependence. The factor shortlist was compared with the initial long list identified from the literature to understand the longitudinal trend. The trend manifested in this research necessitated a shift of project management focus from technical difficulties to managerial issues, signaled by the shifting emphasis from contractor planning and control to client monitoring and management and from project difficulties to contract qualities. The shortlisted factors and their interrelationships together formed a fragmentary mechanism and gave the model structure, which was quantified with Bayesian belief network analysis. The model automatically can calculate cost overrun potentials with relevant input and use influence diagrams to find optimal decisions maximizing the expected values of construction cost overrun potential. The predictive model achieved an accuracy rate of 92.4%, which is much higher than that of the comparable model established with the full formation mechanism. This demonstrated that mechanistic models featuring a fragmentary formation mechanism well achieved satisfactory prediction accuracy and efficiency. Therefore, this predictive model provides a framework for project auditors and other relevant project management personnel to monitor project cost proactively throughout the project lifecycle.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Construction of a 5D duration and cost optimisation model based on genetic algorithm and BIM
    He, Wei
    Shi, Yichao
    Kong, Dcwci
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 17 (05) : 929 - 942
  • [32] Material Based Penalty-Cost Quantification Model for Construction Projects Influencing Waste Management
    Nawaz, Ahsan
    Chen, Jian
    Su, Xing
    Hassan, Hafiz Muhammad Zahid
    FRONTIERS IN ENVIRONMENTAL SCIENCE, 2022, 10
  • [33] Understanding the Factors and the Corresponding Interactions That Influence Construction Worker Safety Performance from a Competency-Model-Based Perspective: Evidence from Scaffolders in China
    Liang, Kongzheng
    Fung, Ivan Wing Hong
    Xiong, Chaohua
    Luo, Hanbin
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (11)
  • [34] An overlapping-based process model for managing schedule and cost risk in product development
    Yang, Qing
    Zhang, Xiaofeng
    Yao, Tao
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2012, 20 (01): : 3 - 17
  • [35] Construction of a Bayesian Network Based on Leadership-Culture-Behavior Model to Improve Owner Safety Management Behavior
    Fang, Dongping
    Wang, Yao
    Lim, Huey Wen
    Ma, Linyao
    Gu, Botao
    Huang, Yuecheng
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (03)
  • [36] Vibration-based Bayesian model updating of civil engineering structures applying Gaussian process metamodel
    Moravej, Hossein
    Chan, Tommy H. T.
    Khac-Duy Nguyen
    Jesus, Andre
    ADVANCES IN STRUCTURAL ENGINEERING, 2019, 22 (16) : 3487 - 3502
  • [37] A bayesian belief network based model for predicting software faults in early phase of software development process
    Subhashis Chatterjee
    Bappa Maji
    Applied Intelligence, 2018, 48 : 2214 - 2228
  • [38] A bayesian belief network based model for predicting software faults in early phase of software development process
    Chatterjee, Subhashis
    Maji, Bappa
    APPLIED INTELLIGENCE, 2018, 48 (08) : 2214 - 2228
  • [39] Simulation-based evaluation of maintenance strategies from a life cycle cost perspective
    H-Nia, Saeed
    Krishna, Visakh V.
    Odolinski, Kristofer
    Torstensson, Peter T.
    Ait-Ali, Abderrahman
    Sundholm, Lars
    Kraik, Per-Olof Larsson
    Stichel, Sebastian
    WEAR, 2023, 532
  • [40] Model-based broadband estimation of cutting forces and tool vibration in milling through in-process indirect multiple-sensors measurements
    Albertelli, P.
    Goletti, M.
    Torta, M.
    Salehi, M.
    Monno, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 82 (5-8) : 779 - 796