Auditing Construction Cost from an In-Process Perspective Based on a Bayesian Predictive Model

被引:5
|
作者
Wang, Peipei [1 ]
Wang, Kun [2 ]
Huang, Yunhan [1 ]
Fenn, Peter [2 ]
Stewart, Ian [2 ]
机构
[1] Jiangsu Ocean Univ, Sch Civil & Ocean Engn, Lianyungang 222000, Peoples R China
[2] Univ Manchester, Sch Mech Aerosp & Civil Engn, Manchester M13 9PL, Lancs, England
关键词
Cost overrun; In-process audit; Prediction; Construction projects; Bayesian belief network; CRITICAL SUCCESS FACTORS; DELAY FACTORS; RISK ANALYSIS; PROJECTS; OVERRUN; TIME; IDENTIFICATION;
D O I
10.1061/(ASCE)CO.1943-7862.0002253
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The traditional audit process in construction cost control usually occurs passively at the end of a project life cycle. This calls for a predictive model that provides a framework assembling essential information and predicts construction cost overrun potential during project processes. Unlike previous mechanistic models that reflect the full formation mechanism, the model established in this paper features a fragmentary formation mechanism consisting of shortlisted critical factors. Factors were shortlisted by both theoretical and statistical criticality to construction cost overrun, dictating the factors to pass the initial literature review identification, expert opinion verification, and Pearson's chi-square tests of interdependence. The factor shortlist was compared with the initial long list identified from the literature to understand the longitudinal trend. The trend manifested in this research necessitated a shift of project management focus from technical difficulties to managerial issues, signaled by the shifting emphasis from contractor planning and control to client monitoring and management and from project difficulties to contract qualities. The shortlisted factors and their interrelationships together formed a fragmentary mechanism and gave the model structure, which was quantified with Bayesian belief network analysis. The model automatically can calculate cost overrun potentials with relevant input and use influence diagrams to find optimal decisions maximizing the expected values of construction cost overrun potential. The predictive model achieved an accuracy rate of 92.4%, which is much higher than that of the comparable model established with the full formation mechanism. This demonstrated that mechanistic models featuring a fragmentary formation mechanism well achieved satisfactory prediction accuracy and efficiency. Therefore, this predictive model provides a framework for project auditors and other relevant project management personnel to monitor project cost proactively throughout the project lifecycle.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] A Bayesian belief network predictive model for construction delay avoidance in the UK
    Wang, Peipei
    Fenn, Peter
    Wang, Kun
    Huang, Yunhan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (05) : 2011 - 2026
  • [2] Project reputation in construction: a process-based perspective of construction practitioners in the UK
    Olawale, Oladimeji
    Oyedele, Lukumon
    Owolabi, Hakeem
    Gbadamosi, Abdul-Quayyum
    Kusimo, Habeeb
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2267 - 2278
  • [3] SPACE ZONING CONCEPT-BASED SCHEDULING MODEL FOR REPETITIVE CONSTRUCTION PROCESS
    Cho, Kyuman
    Hong, Taehoon
    Hyun, Chang Taek
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 (03) : 409 - 421
  • [4] Quality Cost Forecast of the Construction Enterprise Based on SVR Model
    Niu, Jianguang
    Gao, Chunyan
    Xing, Xiuqing
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 3011 - 3014
  • [5] Dynamic model identification for CNC machine tool feed drives from in-process signals for virtual process planning
    Turhan, Mustafa Hakan
    Tseng, Ginette Wei Get
    Erkorkmaz, Kaan
    Fidan, Baris
    MECHATRONICS, 2020, 72
  • [6] Adaptive Model Predictive Current Control for PMSM Drives Based on Bayesian Inference
    Zhang, Xiaoguang
    Yu, Xiang
    Zhang, Guofu
    IEEE TRANSACTIONS ON POWER ELECTRONICS, 2025, 40 (06) : 8490 - 8502
  • [7] Building Engineering Cost Prediction Based On Deep Learning: Model Construction and Real - Time Optimization
    Zhang, Guoping
    Zhang, Qiuyue
    JOURNAL OF ELECTRICAL SYSTEMS, 2024, 20 (05) : 176 - +
  • [8] AEHO: Apriori-Based Optimized Model for Building Construction to Time-Cost Tradeoff Modeling
    Gupta, Rakesh
    Trivedi, Manoj Kumar
    IEEE ACCESS, 2022, 10 : 103852 - 103871
  • [9] Model predictive control based active chatter control in milling process
    Li, Denghui
    Cao, Hongrui
    Zhang, Xingwu
    Chen, Xuefeng
    Yan, Ruqiang
    MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2019, 128 : 266 - 281
  • [10] Innovation transfer in construction: re-interpreting factor-based research from the perspective of the social construction of technology (SCOT)
    Wafai, Mohamad Hassan
    Aouad, Ghassan
    CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (05): : 1323 - 1344