Modelling the boundaries of project fast-tracking

被引:24
作者
Ballesteros-Perez, Pablo [1 ]
机构
[1] Univ Reading, Sch Built Environm, Reading RG6 6DF, Berks, England
关键词
Concurrent engineering; Scheduling; Fast-tracking; Activity crashing; Schedule compression; Activity overlap; CONSTRUCTION ACTIVITIES; HEURISTIC METHOD; DESIGN; OPTIMIZATION; INFORMATION; TIME;
D O I
10.1016/j.autcon.2017.09.006
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Fast-tracking a project involves carrying out sequential activities in parallel, partially overriding their original order of precedence, to reduce the overall project duration. The current predominant mathematical models of fast-tracking are based on the concepts of activity sensitivity, evolution, dependency and, sometimes, information exchange uncertainty, and aim to determine optimum activity overlaps. However, these models require some subjective inputs from the scheduler and most of them neglect the merge event bias. In this paper, a stochastic model for schedule fast-tracking is proposed. Relevant findings highlight the existence of a pseudo-physical barrier that suggests that the possibility of shortening a schedule by more than a quarter of its original duration is highly unlikely. The explicit non-linear relationship between cost and overlap has also been quantified for the first time. Finally, manual calculations using the new model are compared with results from a Genetic Algorithm through a case study.
引用
收藏
页码:231 / 241
页数:11
相关论文
共 56 条
[1]   The Predictability of Fast-Track Projects [J].
Alhomadi, A. A. ;
Dehghan, R. ;
Ruwanpura, J. Y. .
PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
[2]  
Alhomadi A.A., 2013, 4 CONSTR SPEC C MONT
[3]   Integrating concurrent engineering concepts in a steelwork construction project [J].
Anumba, CJ ;
Baldwin, AN ;
Bouchlaghem, D ;
Prasad, B ;
Cutting-Decelle, AF ;
Dufau, J ;
Mommessin, M .
CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2000, 8 (03) :199-212
[4]   Integrating numerical tools in underground construction process [J].
Attar, Ahmed ;
Boudjakdji, Mohamed ;
Bhuiyan, Nadia ;
Grine, Khaled ;
Kenai, Said ;
Aoubed, Ali .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2009, 16 (04) :376-+
[5]  
Austin R.B., 2016, ASCE J CONSTRUCTION, V142, P1
[6]  
Baker A., 1983, INT J PROJ MANAG, V1
[7]   M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics [J].
Ballesteros-Perez, Pablo .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (09)
[8]   Sensitivity of Construction Activities under Design Uncertainty [J].
Blacud, Nicolas A. ;
Bogus, Susan M. ;
Diekmann, James E. ;
Molenaar, Keith R. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (03) :199-206
[9]   Simulation of Overlapping Design Activities in Concurrent Engineering [J].
Bogus, S. M. ;
Diekmann, J. E. ;
Molenaar, K. R. ;
Harper, C. ;
Patil, S. ;
Lee, J. S. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11) :950-957
[10]   Concurrent engineering approach to reducing design delivery time [J].
Bogus, SM ;
Molenaar, KR ;
Diekmann, JE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (11) :1179-1185