Robust rolling stock in rapid transit networks

被引:55
作者
Cadarso, Luis [1 ]
Marin, Angel [1 ]
机构
[1] Univ Politecn Madrid, Escuela Tecn Super Ingenieros Aeronaut, E-28040 Madrid, Spain
关键词
Rapid transit; Robust rolling stock; Shunting; FLEET ASSIGNMENT PROBLEM; CAR ASSIGNMENT; CIRCULATION;
D O I
10.1016/j.cor.2010.10.029
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper focuses on the railway rolling stock circulation problem in rapid transit networks, in which frequencies are high and distances are relatively short. Although the distances are not very large, service times are high due to the large number of intermediate stops required to allow proper passenger flow. The main complicating issue is the fact that the available capacity at depot stations is very low, and both capacity and rolling stock are shared between different train lines. This forces the introduction of empty train movements and rotation maneuvers, to ensure sufficient station capacity and rolling stock availability. However, these shunting operations may sometimes be difficult to perform and can easily malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operation will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Critic trains, defined as train services that come through stations that have a large number of passengers arriving at the platform during rush hours, are also introduced. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results of the model, achieved in approximately 1 min, have been received positively by RENFE planners. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1131 / 1142
页数:12
相关论文
共 24 条
[1]   APPLYING INTEGER LINEAR-PROGRAMMING TO THE FLEET ASSIGNMENT PROBLEM [J].
ABARA, J .
INTERFACES, 1989, 19 (04) :20-28
[2]   Efficient circulation of railway rolling stock [J].
Alfieri, Arianna ;
Groot, Rutger ;
Kroon, Leo ;
Schrijver, Alexander .
TRANSPORTATION SCIENCE, 2006, 40 (03) :378-391
[3]   Schedule optimization at SNCF: From conception to day of departure [J].
Ben-Khedher, N ;
Kintanar, J ;
Queille, C ;
Stripling, W .
INTERFACES, 1998, 28 (01) :6-22
[4]  
BRUCKER P, 1998, OSNABRUCKER SCHRIF P
[5]  
CACCHIANI V, 2009, WP4TR186 ARRIVAL
[6]  
CACCHIANI V, 2008, WP4TR121 ARRIVAL
[7]   Robust routing of rapid transit rolling stock [J].
Cadarso L. ;
Marín A. .
Public Transport, 2010, 2 (01) :51-68
[8]   A benders decomposition approach for the locomotive and car assignment problem [J].
Cordeau, JF ;
Soumis, F ;
Desrosiers, J .
TRANSPORTATION SCIENCE, 2000, 34 (02) :133-149
[9]   Simultaneous locomotive and car assignment at VIA Rail Canada [J].
Cordeau, JF ;
Desaulniers, G ;
Lingaya, N ;
Soumis, F ;
Desrosiers, J .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2001, 35 (08) :767-787
[10]   A LAGRANGIAN-RELAXATION APPROACH TO ASSIGNING AIRCRAFT TO ROUTES IN HUB AND SPOKE NETWORKS [J].
DASKIN, MS ;
PANAYOTOPOULOS, ND .
TRANSPORTATION SCIENCE, 1989, 23 (02) :91-99