A fuzzy analytic hierarchy process for risk evaluation of urban rail transit PPP projects

被引:11
作者
Feng, Yuting [1 ]
Guo, Xuemeng [1 ]
Wei, Bolu [1 ]
Chen, Bingyao [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Econ & Management, Beijing 100044, Peoples R China
基金
中国国家自然科学基金;
关键词
Fuzzy analytic hierarchy process; urban rail transit; PPP mode; risk evaluation; AHP;
D O I
10.3233/JIFS-189997
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The Public-Private Partnership (PPP mode) has been widely used in the field of transportation infrastructure. It can relieve the debt pressure of local governments and improve the efficiency of resource allocation. However, due to the long life cycle of urban rail transit PPP projects and numerous participants, the potential risks arising from the coordination of multiparty relations have become a major obstacle to the development of urban rail transit PPP mode. Based on the perspective of the PPP project company (SPV), this paper adopts the method of fuzzy analytic hierarchy process, takes Shenzhen Metro Line 4 project as the research object and constructs the risk index system from nine dimensions to evaluate the risks of PPP project. Political risk, legal risk and project promotion risk are the most important risk indicators, while relationship risk and force majeure risk take the lowest proportion. According to the above results, the risk management system, risk sharing scheme and countermeasures in key risk areas are proposed. The study not only applies the fuzzy analytic hierarchy process to the research of urban rail transit risks, but also provides a systematic risk assessment basis and prevention and control reference for the smooth implementation of PPP projects.
引用
收藏
页码:5117 / 5128
页数:12
相关论文
共 43 条
[1]  
AHWIRENG-OBENG F., 2002, Journal of Business Management, V33, P29
[2]  
Alam M.M., 2018, J SYSTEM MANAGE SCI, V8, P38
[3]  
Bi X.L, 2012, URBAN RAIL TRANSIT R, V7, P12
[4]  
Chen G., 2013, AUDIT RES, V6, P93
[5]   Modelling Risk Perceptions of Stakeholders in Public-Private Partnership Toll Road Contracts [J].
Chung, Demi ;
Hensher, David A. .
ABACUS-A JOURNAL OF ACCOUNTING FINANCE AND BUSINESS STUDIES, 2015, 51 (03) :437-483
[6]   AN EXPERIMENTAL APPLICATION OF THE DELPHI METHOD TO THE USE OF EXPERTS [J].
DALKEY, N ;
HELMER, O .
MANAGEMENT SCIENCE, 1963, 9 (03) :458-467
[7]  
Deng X. P., 2008, CONSTRUCTION EC, V9, P32
[8]  
Deng X.P, 2009, MODERN MANAGEMENT SC, V12, P55
[9]  
Grimsey D., 2002, Int. J. Proj. Manag., V20, P107, DOI DOI 10.1016/S0263-7863(00)00040-5
[10]  
Guo J., 2013, MANAGE REV, V7, P11