Simultaneous Placement of Fault Indicator and Sectionalizing Switch in Distribution Networks

被引:72
作者
Farajollahi, Mohammad [1 ]
Fotuhi-Firuzabad, Mahmud [1 ]
Safdarian, Amir [1 ]
机构
[1] Sharif Univ Technol, Ctr Excellence Power Syst Control & Management, Elect Engn Dept, Tehran 1136511155, Iran
基金
美国国家科学基金会;
关键词
Fault indicator; fault management; manual switch; mixed integer programming; remote control switch; DISTRIBUTION-SYSTEMS; COST; AUTOMATION; DEPLOYMENT; RELOCATION;
D O I
10.1109/TSG.2018.2794994
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Automation systems provide substantial improvement in service reliability through speeding up fault management procedure. However, this is at expense of high investments whose justification needs thorough cost/worth analyses. This paper introduces a mathematical model to optimally place automation system devices within distribution networks. The model establishes a trade-off between service reliability improvements and the relevant costs. Among different automation system devices, fault indicators and remote controlled switches are considered here. Also, the impact of manual switches is regarded since their number and location significantly affect the solution of the placement problem. The proposed model is developed in the mixed integer programming format which can be effectively solved via available solvers. The effectiveness of the proposed model is demonstrated through a test system and a real-life distribution network. The obtained results indicate the great performance of the model in enhancing service reliability as well as reducing system costs.
引用
收藏
页码:2278 / 2287
页数:10
相关论文
共 34 条
  • [21] Computational study of search strategies for mixed integer programming
    Linderoth, JT
    Savelsbergh, MWP
    [J]. INFORMS JOURNAL ON COMPUTING, 1999, 11 (02) : 173 - 187
  • [22] Meyer R. R., 1974, Mathematical Programming, V7, P223, DOI 10.1007/BF01585518
  • [23] Mitra Gautam., 1973, Mathematical Programming, V4, P155
  • [24] Optimal switch placement in distribution systems using trinary particle swarm optimization algorithm
    Moradi, Adel
    Fotuhi-Firuzabad, M.
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2008, 23 (01) : 271 - 279
  • [25] Rosenthal R., 2007, GAMS USERS GUIDE
  • [26] Impacts of Remote Control Switch Malfunction on Distribution System Reliability
    Safdarian, Amir
    Farajollahi, Mohammad
    Fotuhi-Firuzabad, Mahmud
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2017, 32 (02) : 1572 - 1573
  • [27] A joint automatic and manual switch placement within distribution systems considering operational probabilities of control sequences
    Shahsavari, Alireza
    Fereidunian, Alireza
    Mazhari, Seyed Mahdi
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2015, 25 (11): : 2745 - 2768
  • [28] Fault Indicator Deployment in Distribution Systems Considering Available Control and Protection Devices: A Multi-Objective Formulation Approach
    Shahsavari, Alireza
    Mazhari, Seyed Mahdi
    Fereidunian, Alireza
    Lesani, Hamid
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (05) : 2359 - 2369
  • [29] Optimal Distribution Network Automation Considering Earth Fault Events
    Siirto, Osmo K.
    Safdarian, Amir
    Lehtonen, Matti
    Fotuhi-Firuzabad, Mahmud
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2015, 6 (02) : 1010 - 1018
  • [30] A novel ACS-based optimum switch relocation method
    Teng, JH
    Liu, YH
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (01) : 113 - 120