Simultaneous Placement of Fault Indicator and Sectionalizing Switch in Distribution Networks

被引:72
作者
Farajollahi, Mohammad [1 ]
Fotuhi-Firuzabad, Mahmud [1 ]
Safdarian, Amir [1 ]
机构
[1] Sharif Univ Technol, Ctr Excellence Power Syst Control & Management, Elect Engn Dept, Tehran 1136511155, Iran
基金
美国国家科学基金会;
关键词
Fault indicator; fault management; manual switch; mixed integer programming; remote control switch; DISTRIBUTION-SYSTEMS; COST; AUTOMATION; DEPLOYMENT; RELOCATION;
D O I
10.1109/TSG.2018.2794994
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Automation systems provide substantial improvement in service reliability through speeding up fault management procedure. However, this is at expense of high investments whose justification needs thorough cost/worth analyses. This paper introduces a mathematical model to optimally place automation system devices within distribution networks. The model establishes a trade-off between service reliability improvements and the relevant costs. Among different automation system devices, fault indicators and remote controlled switches are considered here. Also, the impact of manual switches is regarded since their number and location significantly affect the solution of the placement problem. The proposed model is developed in the mixed integer programming format which can be effectively solved via available solvers. The effectiveness of the proposed model is demonstrated through a test system and a real-life distribution network. The obtained results indicate the great performance of the model in enhancing service reliability as well as reducing system costs.
引用
收藏
页码:2278 / 2287
页数:10
相关论文
共 34 条
  • [11] Optimal placement of line switches for distribution automation systems using immune algorithm
    Chen, Chao-Shun
    Lin, Chia-Hung
    Chuang, Hui-Jen
    Li, Chung-Sheng
    Huang, Ming-Yang
    Huang, Chia-Wen
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) : 1209 - 1217
  • [12] Combinatorial benders' cuts for mixed-integer linear programming
    Codato, Gianni
    Fischetti, Matteo
    [J]. OPERATIONS RESEARCH, 2006, 54 (04) : 756 - 766
  • [13] Farajollahi M., IEEE T SMART GRID
  • [14] Deployment of Fault Indicator in Distribution Networks: A MIP-Based Approach
    Farajollahi, Mohammad
    Fotuhi-Firuzabad, Mahmud
    Safdarian, Amir
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2018, 9 (03) : 2259 - 2267
  • [15] Optimal Placement of Fault Indicators Using the Immune Algorithm
    Ho, Chin-Ying
    Lee, Tsung-En
    Lin, Chia-Hung
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (01) : 38 - 45
  • [16] Izadi M., 2016, 2016 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS), P1, DOI DOI 10.1109/PMAPS.2016.7764185
  • [17] Financial risk constrained remote controlled switch deployment in distribution networks
    Izadi, Milad
    Safdarian, Amir
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (07) : 1547 - 1553
  • [18] Kazemi S., 2011, THESIS
  • [19] King K., 2012, Willingness to Pay to Avoid Outages: Reliability Demand Survey
  • [20] An Optimal Composition and Placement of Automatic Switches in DAS
    Lim, I.
    Sidhu, T. S.
    Choi, M. S.
    Lee, S. J.
    Ha, B. N.
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2013, 28 (03) : 1474 - 1482