共 50 条
- [1] Hot Water Distribution System Piping Time, Water, and Energy Waste-Phase II Test Results ASHRAE TRANSACTIONS 2008, VOL 114, PT 2, 2008, 114 : 109 - 118
- [2] Hot water distribution system piping time, water, and energy waste - Phase I: Test results ASHRAE Transactions 2006, Vol 112, Pt 1, 2006, 112 : 415 - 425
- [3] Hot-Water Distribution System Piping Heat Loss Factors-Phase III: Test Results ASHRAE: TRANSACTIONS 2011, VOL 117, PT 1, 2011, 117 : 727 - 741
- [4] Hot water distribution system piping heat loss factors - Phase I: Test results ASHRAE Transactions 2006, Vol 112, Pt 1, 2006, 112 : 436 - 446
- [5] Pilot Phase of a Field Study to Determine Waste of Water and Energy in Residential Hot-Water Distribution Systems ASHRAE: TRANSACTIONS 2011, VOL 117, PT 1, 2011, 117 : 755 - 768
- [6] Hot Water Distribution System Piping Heat Loss Factors, Both In Air and Buried-Phase II Test Results ASHRAE TRANSACTIONS 2008, VOL 114, PT 2, 2008, 114 : 96 - 108
- [7] Hot-Water Use in Hotels: Part 2-Travel Hotel Hot-Water System Monitoring Results ASHRAE TRANSACTIONS, VOL 122, PT 1, 2016, 122 : 395 - 408
- [8] Hot-Water Use in Hotels: Part 3-Business Hotel Hot-Water System Monitoring Results ASHRAE TRANSACTIONS, VOL 122, PT 1, 2016, 122 : 409 - 421
- [10] COPPER CORROSION IN A RECIRCULATING HOT-WATER DISTRIBUTION-SYSTEM JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1985, 77 (04): : 60 - 60