Final design of ITER port plug test facility

被引:1
作者
Cerisier, Thierry [1 ]
Levesy, Bruno [1 ]
Romannikov, Alexander [2 ]
Rumyantsev, Yuri [3 ]
Cordier, Jean-Jacques [1 ]
Dammann, Alexis [1 ]
Minakov, Victor
Rosales, Natalya [3 ]
Mitrofanova, Elena [3 ]
Portone, Sergey [2 ]
Mironova, Ekaterina [2 ]
机构
[1] ITER Org, Route Vinon Sur Verdon,CS 90046, F-13067 St Paul Les Durance, France
[2] Inst Project Ctr ITER, Kurchatov Sq 1,Bldg 3, Moscow 123182, Russia
[3] JSC Cryogenmash, Balashikha 143907, Moscow Reg, Russia
关键词
Acceptance test; Hot cell; Refurbishment; Vacuum; Port plug; PROGRESS;
D O I
10.1016/j.fusengdes.2015.12.064
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
To achieve the overall ITER machine availability target, the availability of diagnostics and heating port plugs shall be as high as 99.5%. To fulfill this requirement, it is mandatory to test the port plugs at operating temperature before installation on the machine and after refurbishment. The ITER port plug test facility (PPTF) is composed of several test stands that can be used to test the port plugs whereas at the end of manufacturing (in a non-nuclear environment), or after refurbishment in the ITER hot cell facility. The PPTF provides the possibility to perform environmental (leak tightness, vacuum and thermo-hydraulic performances) and functional tests (radio frequency acceptance tests, behavior of the plugs' steering mechanism and calibration of diagnostics) on upper and equatorial port plugs. The final design of the port plug test facility is described. The configuration of the standalone test stands and the integration" in the hot cell facility are presented. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:1153 / 1157
页数:5
相关论文
共 50 条
[41]   Physics design of the injector source for ITER neutral beam injector (invited) [J].
Antoni, V. ;
Agostinetti, P. ;
Aprile, D. ;
Cavenago, M. ;
Chitarin, G. ;
Fonnesu, N. ;
Marconato, N. ;
Pilan, N. ;
Sartori, E. ;
Serianni, G. ;
Veltri, P. .
REVIEW OF SCIENTIFIC INSTRUMENTS, 2014, 85 (02)
[42]   Conceptual design and optimization of an ITER-type ICRF antenna on CFETR [J].
Zhang, W. ;
Liang, Q. C. ;
Qin, C. M. ;
Zhang, X. J. ;
Wang, Y. S. ;
Yang, H. ;
Liu, L. N. ;
Zhu, G. H. ;
Mao, Y. Z. ;
Yuan, S. ;
Cheng, Y. .
NUCLEAR FUSION, 2022, 62 (07)
[43]   Progress in the design of ITER front-end vacuum instrumentation and controls [J].
Boussier, Bastien ;
Bryan, Stephen ;
Dremel, Matthias ;
Fourneron, Jean-Marc ;
Mayaux, Christian ;
Pearce, Robert ;
Saunders, Peter ;
Mokashi, Dhananjay ;
Poncet, Jean-Marc ;
Diribarne, Pantxo .
FUSION ENGINEERING AND DESIGN, 2013, 88 (6-8) :831-834
[44]   Neutronic performance of Indian LLCB TBM set conceptual design in ITER [J].
Swami, H. L. ;
Shaw, A. K. ;
Mistry, A. N. ;
Danani, C. .
FUSION ENGINEERING AND DESIGN, 2016, 113 :71-81
[45]   Major aspects of the design of a first mirror for the ITER core CXRS diagnostics [J].
Krasikov, Yury ;
Panin, Anatoly ;
Biel, Wolfgang ;
Krimmer, Andreas ;
Litnovsky, Andrey ;
Mertens, Philippe ;
Neubauer, Olaf ;
Schrader, Michael .
FUSION ENGINEERING AND DESIGN, 2015, 96-97 :812-816
[46]   The GALATEA test-facility for high purity germanium detectors [J].
Abt, I. ;
Caldwell, A. ;
Doenmez, B. ;
Garbini, L. ;
Irlbeck, S. ;
Majorovits, B. ;
Palermo, M. ;
Schulz, O. ;
Seitz, H. ;
Stelzer, F. .
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2015, 782 :56-62
[47]   Design overview of the ITER core CXRS fast shutter and manufacturing implications during the detailed design work [J].
Bardawil, David Antonio Castano ;
Mertens, Philippe ;
Offermanns, Guido ;
Behr, Wilfried ;
Hawkes, Nick ;
Krasikov, Yury ;
Balboa, Itziar ;
Biel, Wolfgang ;
Samm, Ulrich .
FUSION ENGINEERING AND DESIGN, 2015, 96-97 :746-750
[48]   Ripple effect and impact of test blanket module by using RAFM steels on the plasma of ITER [J].
Liu, Songlin ;
Liu, Yang ;
Wang, Weihua ;
Lu, Ruojun ;
Jin, Ming ;
Zeng, Qin .
FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) :1206-1213
[49]   Conceptual study for TBM-related activities in ITER Hot Cell Facility before TBM shipment back to owner [J].
Bai, Yunqing ;
Benchikhoune, Magali ;
Jin, Ming ;
Liu, Yang ;
Liu, Songlin .
FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) :1913-1918
[50]   Status Status of the final design of the EC UPP launcher [J].
Spaeh, Peter ;
Aiello, Gaetano ;
Chavan, Rene ;
Gagliardi, Mario ;
Grossetti, Giovanni ;
Heemskerk, Cock ;
Landis, Jean-Daniel ;
Meier, Andreas ;
Pacheco, Jose ;
Ronden, Dennis ;
Scherer, Theo ;
Schreck, Sabine ;
Strauss, Dirk ;
Vaccaro, Alessandro ;
Weinhorst, Bastian .
FUSION ENGINEERING AND DESIGN, 2018, 136 :1058-1062