Automated assembly discrepancy feedback using 3D imaging and forward kinematics

被引:26
作者
Nahangi, Mohammad [1 ]
Yeung, Jamie [1 ]
Haas, Carl T. [1 ]
Walbridge, Scott [1 ]
West, Jeffrey [1 ]
机构
[1] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON N2L 3G1, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Realignment feedback; Fabrication error; Deviation analysis; Refit and plumbness; Robotic forward kinematics; 3D imaging; Laser scanning; Pipelines; Pipe spools; REGISTRATION METHODS; CAD MODEL; CONSTRUCTION; RECONSTRUCTION; REWORK; SIMULATION; RETRIEVAL; ACCURACY; QUALITY;
D O I
10.1016/j.autcon.2015.04.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Assembly of steel structures, modules, and pipe spools requires cycles of fitting and alignment in fabrication facilities and on construction sites. To minimize this work, good discrepancy feedback for automated refitting and realignment is required. A framework for such feedback is presented here that overcomes current limitations. It commences with a constrained registration step to overcome the incapabilities of the current discrepancy analysis approaches. By borrowing concepts from robotic kinematics and 3D image alignment theories, forward kinematics models are generated link by link, and thus provide the means for a local discrepancy analysis for quantifying the deviations autonomously. Experiments show that the proposed approach is suitably accurate and sufficiently fast to be employed for real-time feedback in order to systematically and automatically develop the realignment plans required for refitting and realigning assemblies, which is the key contribution of the work presented in this paper. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:36 / 46
页数:11
相关论文
共 61 条
  • [31] Haas C., 1995, Microcomputers in Civil Engineering, V10, P371
  • [32] Haas C.T., 2002, Preliminary Research on Prefabrication, Pre-Assembly, Modularization and Off-Site Fabrication in Construction
  • [33] Measuring the Impact of Rework on Construction Cost Performance
    Hwang, Bon-Gang
    Thomas, Stephen R.
    Haas, Carl T.
    Caldas, Carlos H.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (03) : 187 - 198
  • [34] Multi-image stitching and scene reconstruction for evaluating defect evolution in structures
    Jahanshahi, Mohammad R.
    Masri, Sami F.
    Sukhatme, Gaurav S.
    [J]. STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL, 2011, 10 (06): : 643 - 657
  • [35] Fully automated registration of 3D data to a 3D CAD model for project progress monitoring
    Kim, Changmin
    Son, Hyojoo
    Kim, Changwan
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 35 : 587 - 594
  • [36] Automated construction progress measurement using a 4D building information model and 3D data
    Kim, Changmin
    Son, Hyojoo
    Kim, Changwan
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 31 : 75 - 82
  • [37] Kjer H., 2010, THESIS TU DENMARK
  • [38] Imaged-based verification of as-built documentation of operational buildings
    Klein, Laura
    Li, Nan
    Becerik-Gerber, Burcin
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 21 : 161 - 171
  • [39] Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds
    Kwon, SW
    Bosche, F
    Kim, C
    Haas, CT
    Liapi, KA
    [J]. AUTOMATION IN CONSTRUCTION, 2004, 13 (01) : 67 - 81
  • [40] Skeleton-based 3D reconstruction of as-built pipelines from laser-scan data
    Lee, Joohyuk
    Son, Hyojoo
    Kim, Changmin
    Kim, Changwan
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 35 : 199 - 207