Improving a travel-time estimation algorithm by using dual loop detectors

被引:95
作者
van Lint, JWC
van der Zijpp, NJ
机构
[1] Delft Univ Technol, Fac Civil Engn & Geosci, Transportat & Planning Dept, NL-2600 GA Delft, Netherlands
[2] Modelit, NL-3042 AS Rotterdam, Netherlands
来源
TRANSPORTATION DATA RESEARCH: PLANNING AND ADMINISTRATION | 2003年 / 1855期
关键词
D O I
10.3141/1855-05
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An algorithm is presented for off-line estimation of route-level travel times for uninterrupted traffic flow facilities, such as motorway corridors, based on time series of traffic-speed observations taken from the sections that constitute a route. The proposed method is an extension of the widely used trajectory method. The novelty of the presented method is that trajectories are based on the assumption of piecewise linear (and continuous at section boundaries) vehicle speeds rather than piecewise constant (and discontinuous at section boundaries) speeds. From these assumptions, mathematical expressions are derived that describe the trajectories within each section. These expressions can be used to replace their existing counterparts in the traditional trajectory methods. A comparison of the accuracy of the new method and of the existing method was carried out by using simulated data. This comparison showed that the root-mean-square error (RMSE) value for the new method is about half the RMSE value for the existing method. When this RMSE is decomposed in a bias and a residual error, it turns out that the existing method significantly overestimates the travel time. However, the largest part of the reduction of the RMSE value is still caused by a reduction of the residual error. In other words, if both methods are corrected for their bias, the new method performs significantly better.
引用
收藏
页码:41 / 48
页数:8
相关论文
共 15 条
[1]  
[Anonymous], INTRO THEORY TRAFFIC
[2]  
[Anonymous], P 6 ITS WORLD C TOR
[4]  
Kazimi C., 2000, 79 ANN M TRANSP RES
[5]  
KIRWAN K, 2002, PREDICTABILITY TRAVE, P1
[6]  
KRAAN M, 1999, J TRANSPORTATION RES, P60
[7]  
Lighthilland MJ, 1955, P ROY SOC A, V229, P317, DOI [10.1098/rspa.1955.0089, DOI 10.1098/RSPA.1955.0089]
[8]  
Lindveld CDR, 2000, TRANSPORT RES REC, P45
[9]  
THIJS R, 1999, EVALUATION TRAVEL TI
[10]   Travel time estimation in the GERDIEN project [J].
VanArem, B ;
VanderVlist, MJM ;
Muste, M ;
Smulders, SA .
INTERNATIONAL JOURNAL OF FORECASTING, 1997, 13 (01) :73-85