A model for financial viability of implementation of condition based maintenance for induction motors

被引:2
作者
Gugaliya, Agam [1 ]
Naikan, V. N. A. [1 ]
机构
[1] Indian Inst Technol Kharagpur, Subir Chowdhury Sch Qual & Reliabil, Kharagpur, W Bengal, India
关键词
Efficiency; Cost-benefit analysis; Condition-based maintenance; Induction motors; P-F interval; PREVENTIVE MAINTENANCE; FAULT-DIAGNOSIS; AVAILABILITY; OPTIMIZATION; RELIABILITY; POLICY; INTERVALS; SYSTEMS;
D O I
10.1108/JQME-08-2017-0053
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose When induction motors are considered, there is no specific cost model for net savings per year due to condition-based maintenance (CBM) covering various parameters such as downtime, energy, quality, etc. The purpose of this paper is to develop a cost model for the financial viability of the implementation of CBM for induction motors. Design/methodology/approach A literature review has been carried out to identify the existing failure modes of motor, available condition monitoring techniques, the usefulness of CBM and different maintenance models available. Then, a cost model considering all parameters has been proposed. Findings A cost model has been proposed for the maintenance of induction motors. Method for the economic evaluation of the model has also been suggested in the paper. The application of the model has been illustrated through a case study of a steel plant, which suggests that investment in the condition monitoring of induction motors increases the net profit of the organization. Originality/value The paper provides a cost model for the economic evaluation of implementing CBM for induction motors which will be useful to researchers and maintenance managers in effective decision making and maintenance planning. The methodology and the cost models are the original contribution of the authors.
引用
收藏
页码:213 / 230
页数:18
相关论文
共 57 条
  • [1] Abogrean EM, 2012, J MANAG RES, V4, P139
  • [2] Availability and cost-centered preventive maintenance scheduling of continuous operating series systems using multi-objective genetic algorithm: A case study
    Adhikary, Debasis Das
    Bose, Goutam Kumar
    Jana, Dipak Kumar
    Bose, Dipankar
    Mitra, Souren
    [J]. QUALITY ENGINEERING, 2016, 28 (03) : 352 - 357
  • [3] [Anonymous], 1995, RENEW ENERG
  • [4] [Anonymous], 2013, APPL IMAGERY PATTERN, DOI DOI 10.1109/AIPR.2013.6749339
  • [5] [Anonymous], 1985, IEEE T IND APPL
  • [6] [Anonymous], 2002, CAPITAL BUDGETING TH
  • [7] [Anonymous], 1985, IEEE T IND APPL
  • [8] Baglee D., 2016, MFPT 2016 ISAS 62 IN
  • [9] Availability allocation through importance measures
    Barabady, Javad
    Kumar, Uday
    [J]. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2007, 24 (06) : 643 - +
  • [10] Simulation modelling of repairable multi-component deteriorating systems for 'on condition' maintenance optimisation
    Barata, J
    Soares, CG
    Marseguerra, M
    Zio, E
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2002, 76 (03) : 255 - 264