A cascading risk model for the failure of the concrete spillway of the Toddbrook dam, England during the August 2019 flooding

被引:13
作者
Heidarzadeh, Mohammad [1 ]
Feizi, Siamak [2 ]
机构
[1] Univ Bath, Dept Architecture & Civil Engn, Bath BA2 7AY, Somerset, England
[2] Norwegian Geotech Inst NGI, Oslo, Norway
关键词
Dam engineering; Hydraulic engineering; Cascading risks; Numerical modelling; Spillway; Flooding; CONSTRUCTION;
D O I
10.1016/j.ijdrr.2022.103214
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Dam break is considered as a major catastrophe with significant negative economic, social, and environmental consequences, and thus must be prevented at any cost. Here, we report and analyze a near-miss dam break incident in Toddbrook dam, England during the August 2019 flooding, where the spillway of the dam failed putting the entire dam at the risk of failure. A combination of field surveys, desk studies and numerical modelling is applied to analyze the incident and to develop a cascading risk model for the first time. Our hydraulic modelling showed that the spillway was under fast-flowing water having a speed of up to 15.0 m/s. Such a high-speed flow played a major role in the failure of the spillway through facilitating water injec-tion beneath the spillway slabs. The spillway suffered from poor maintenance and was densely vegetated, which most likely undermined the foundation. The spillway was poorly designed as the concrete slabs were relatively thin and unreinforced, the profile of the spillway was not fit for purpose, and the spillway lacked a stilling basin. Due to rapid drawdown, a landslide was generated on the upstream slope of the dam, which was reconstructed through our geotechnical modelling, indicating that a slower pace must have been taken during the process of emptying the reservoir. We developed a cascading risk model which begins with three primary causes of insufficient maintenance, design shortcomings, and the torrential rainfall leading to flooding. Our risk model, which is among the first of its type, would help preventing future dam failures.
引用
收藏
页数:13
相关论文
共 35 条
  • [31] USBR (United States Bureau of Reclamation), 2019, HYDRAULIC LAB REPORT, V42, P41
  • [32] Case study: Malpasset dam-break simulation using a two-dimensional finite volume method
    Valiani, A
    Caleffi, V
    Zanni, A
    [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2002, 128 (05): : 460 - 472
  • [33] Analysis of earth dam failures: A database approach
    Zhang, L. M.
    Xu, Y.
    Jia, J. S.
    [J]. GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2009, 3 (03) : 184 - 189
  • [34] A quantitative risk analysis model for cascade reservoirs overtopping: principle and application
    Zhou, Xingbo
    Chen, Zuyu
    Zhou, Jianping
    Guo, Xinlei
    Du, Xiaohu
    Zhang, Qiang
    [J]. NATURAL HAZARDS, 2020, 104 (01) : 249 - 277
  • [35] Risk analysis and emergency actions for Hongshiyan barrier lake
    Zhou, Xingbo
    Chen, Zuyu
    Yu, Shu
    Wang, Lin
    Deng, Gang
    Sha, Peijun
    Li, Shouyi
    [J]. NATURAL HAZARDS, 2015, 79 (03) : 1933 - 1959