Analytical hierarchy process for justification of total productive maintenance

被引:46
作者
Kodali, R [1 ]
Chandra, S
机构
[1] Birla Inst Technol & Sci, Mech Engn Grp, Pilani 333031, Rajasthan, India
[2] Birla Inst Technol & Sci, Management Studies Grp, Pilani 333031, Rajasthan, India
关键词
TPM; justifiction; AHP;
D O I
10.1080/09537280010024045
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Total Productive Maintenance (TPM) has attracted the attention of industries all over the world. The perceptible impact of TPM lies in attaining the far-reaching productivity and quality standards. Attempts have been made to examine TPM for the feasibility in Indian industries. The present work describes a multiattribute decision model using analytical hierarchy process for the justification of TPM for Indian industries.
引用
收藏
页码:695 / 705
页数:11
相关论文
共 33 条
[1]  
ANDREW C, 1987, APICS C P, P698
[2]  
[Anonymous], J MANUFACTURING
[3]  
ARTES R, 1987, APICS C P, P263
[4]  
BRUNN R, 1987, APICS C P, P62
[5]  
BRUNN R, 1987, APICS C P, P299
[6]  
CHANDRA D, 1991, MANAGING PROFIT
[7]  
CHANDRA S, 1998, INTEGRATED MANUFACTU, V9, P313
[8]  
*DEP IND COMM TECH, 1979, GUID COND MON MACH
[9]  
*DEP IND COMM TECH, 1970, REP MAINT ENG
[10]  
*DEP IND COMM TECH, 1975, TER INTR MAN PHYS RE