Relationships between Stakeholder Pressure, Culture, and CSR-Practices in the Context of Project Management in the Construction Industry in Poland

被引:0
作者
Kowalczyk, Rafal [1 ]
机构
[1] Gdansk Univ Technol, Pomorskie Ctr Technol Badawcze Sp Zoo PCTB, Gdynia, Poland
来源
EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT THROUGH VISION 2020 | 2019年
关键词
CSR-practice; stakeholder pressure; project management; construction industry; CORPORATE SOCIAL-RESPONSIBILITY; MEDIATING ROLE; PERFORMANCE; TRUST;
D O I
暂无
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
The study aims to investigate how CSR-stakeholder pressure, CSR-company culture, and CSR-practices are related to one another based on the example of the construction industry in Poland. This knowledge will make it possible to assess which of the two factors, i.e., stakeholder culture or the internal company culture have a stronger effect on the CSR-practices. To accomplish the goal of the study a sample composed of 216 cases was examined using a structural equation modeling method. The findings suggest that stakeholder pressure is the most substantial influence power on CSR-practices within the construction industry in Poland.
引用
收藏
页码:5663 / 5671
页数:9
相关论文
共 30 条
[1]  
Alotabi A., 2019, INT J ENG MANAGEMENT, V13
[2]  
[Anonymous], 2007, The debate over corporate social responsability
[3]  
[Anonymous], EUR CONSTR IND IS BO
[4]  
[Anonymous], 2015, BUS ETHICS, DOI [DOI 10.1111/beer.12084, DOI 10.1007/s10551-012-1590-1]
[5]   A NEW INCREMENTAL FIT INDEX FOR GENERAL STRUCTURAL EQUATION MODELS [J].
BOLLEN, KA .
SOCIOLOGICAL METHODS & RESEARCH, 1989, 17 (03) :303-316
[6]   SAMPLE-SIZE AND BENTLER AND BONETTS NONNORMED FIT INDEX [J].
BOLLEN, KA .
PSYCHOMETRIKA, 1986, 51 (03) :375-377
[7]   Drivers of Brand Commitment: A Cross-National Investigation [J].
Eisingerich, Andreas B. ;
Rubera, Gaia .
JOURNAL OF INTERNATIONAL MARKETING, 2010, 18 (02) :64-79
[8]  
Freeman R. E., 1984, Strategic management: A stakeholder approach
[9]   Plans versus people: Comparing knowledge management approaches in IT-enabled business projects [J].
Gemino, Andrew ;
Reich, Blaize Horner ;
Sauer, Chris .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (02) :299-310
[10]  
Hair J. F., 2014, Multivariate Data Analysis, V7th