An integrated approach for a new flexible multi-product disassembly line balancing problem

被引:13
|
作者
Hu, Peng [1 ,2 ]
Chu, Feng [2 ]
Liu, Ming [3 ]
Wang, Shijin [3 ]
Wu, Peng [1 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou, Peoples R China
[2] Univ Evry, Univ Paris Saclay, Lab IBISC, F-91025 Evry, France
[3] Tongji Univ, Sch Econ & Management, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Disassembly line balancing; Multi EOL product; Chance-constrained programming; Valid inequalities; Cut-and-solve method; CUT-AND-SOLVE; REMEMBER ALGORITHM; OPTIMIZATION; MODEL; APPROXIMATION; TRANSPORTATION; MANAGEMENT; BRANCH; TIME;
D O I
10.1016/j.cor.2022.105932
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Flexible disassembly line design for end-of-life (EOL) products is a key issue in the remanufacturing industry. However, existing studies for disassembly line balancing have not simultaneously considered multiple EOL products, the identical parts of these products and uncertainty during disassembly, which are important characteristics of flexible disassembly lines. The present study addresses a new flexible multi-product disassembly line balancing problem in which (1) disassembly schemes need to be selected, (2) a workstation can disassemble multiple EOL products, (3) identical parts of multiple products can be treated as identical tasks, and (4) only partial probability distribution information of processing times is known. For the problem, an integrated approach is developed, which is composed of a chance-constrained program, a distribution-free model, efficient valid inequalities and an exact lifted cut-and-solve method. Numerical experiments are conducted on an illustrative example, 10 instances based on realistic products and 480 randomly generated instances with up to 20 products, 400 tasks and 86 workstations. Computational results show that the proposed valid inequalities can reduce about 75% computational time of the original model, and the lifted cut-and-solve method needs only 17.53% and 40.65% of the computational times required by the CPLEX and the classic cut-and-solve method, respectively.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Integrated multi-product reverse supply chain design and disassembly line balancing under uncertainty
    Hu, Peng
    Chu, Feng
    Dolgui, Alexandre
    Chu, Chengbin
    Liu, Ming
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2024, 126
  • [2] An enhanced group teaching optimization algorithm for multi-product disassembly line balancing problems
    Liang, Pei
    Fu, Yaping
    Gao, Kaizhou
    Sun, Hao
    COMPLEX & INTELLIGENT SYSTEMS, 2022, 8 (06) : 4497 - 4512
  • [3] An enhanced group teaching optimization algorithm for multi-product disassembly line balancing problems
    Pei Liang
    Yaping Fu
    Kaizhou Gao
    Hao Sun
    Complex & Intelligent Systems, 2022, 8 : 4497 - 4512
  • [4] Distributionally robust and risk-averse optimisation for the stochastic multi-product disassembly line balancing problem with workforce assignment
    Liu, Xin
    Chu, Feng
    Zheng, Feifeng
    Chu, Chengbin
    Liu, Ming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (06) : 1973 - 1991
  • [5] Integrated disassembly line balancing and routing problem
    Kenger, Zulal Diri
    Koc, Cagri
    Ozceylan, Eren
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (23) : 7250 - 7268
  • [6] Integrated Resource Optimization in a Multi-Product Separated Line Collaborative Assembly Line Balancing Problem (MPSLC-ALBP)
    Keshvarparast, Ali
    Katiraee, Niloofar
    Pirayesh, Amir
    Battaia, Olga
    Berti, Nicola
    IFAC PAPERSONLINE, 2023, 56 (02): : 713 - 718
  • [7] A note on integrated disassembly line balancing and routing problem
    Feng, Jianguang
    Che, Ada
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (09) : 3144 - 3150
  • [8] Multi-product disassembly line balancing optimization method for high disassembly profit and low energy consumption with noise pollution constraints
    Liang, Pei
    Fu, Yaping
    Gao, Kaizhou
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 130
  • [9] Mixed-integer programming model and hybrid driving algorithm for multi-product partial disassembly line balancing problem with multi-robot workstations
    Yin, Tao
    Zhang, Zeqiang
    Zhang, Yu
    Wu, Tengfei
    Liang, Wei
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2022, 73
  • [10] A dynamic programming approach to a multi-objective disassembly line balancing problem
    Yusha Zhou
    Xiuping Guo
    Dong Li
    Annals of Operations Research, 2022, 311 : 921 - 944