Cutter-disc consumption during earth pressure balance tunnelling in mixed strata

被引:4
作者
Elbaz, Khalid [1 ,2 ]
Shen, Shui-Long [1 ,2 ]
Cheng, Wen-Chieh [3 ]
Arulrajah, Arul [4 ]
Shirlaw, James Nicholas [5 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, State Key Lab Ocean Engn, Shanghai, Peoples R China
[2] Collaborat Innovat Ctr Adv Ship & Deep Sea Explor, Shanghai, Peoples R China
[3] Xian Univ Architecture & Univ, Sch Civil Engn, Inst Tunnel & Underground Struct Engn, Xian, Shaanxi, Peoples R China
[4] Swinburne Univ Technol, Dept Civil & Construct Engn, Hawthorn, Vic, Australia
[5] Golder Associates Hong Kong Ltd, Hong Kong, Hong Kong, Peoples R China
关键词
D O I
10.1680/jgeen.18.00129
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
引用
收藏
页码:559 / 561
页数:3
相关论文
共 4 条
[1]  
Cui Q., 2016, THESIS DEP ROBOT SYS
[2]   Chinese karst geology and measures to prevent geohazards during shield tunnelling in karst region with caves [J].
Cui, Qing-Long ;
Wu, Huai-Na ;
Shen, Shui-Long ;
Xu, Ye-Shuang ;
Ye, Guan-Lin .
NATURAL HAZARDS, 2015, 77 (01) :129-152
[3]   Cutter-disc consumption during earth pressure balance tunnelling in mixed strata [J].
Elbaz, Khalid ;
Shen, Shui-Long ;
Cheng, Wen-Chieh ;
Arulrajah, Arul .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2018, 171 (04) :363-376
[4]   Pressurised TBM tunnelling in mixed face conditions resulting from tropical weathering of igneous rock [J].
Shirlaw, James Nicholas .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 :225-240