Quantification of force re-distribution during deck replacement in a cable-stayed bridge

被引:3
作者
Chandra, D [1 ]
机构
[1] USInfrastruct Inc, Atlanta, GA 30305 USA
关键词
cables; cable-stayed bridge; deck panels; deck replacement; edge girder; floor beam; optimum replacement length; stringer; temporary compression strut; unsymmetrical distortion; vertical deflection;
D O I
10.1016/S0045-7949(03)00257-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Deck replacement in a cable-stayed bridge poses problems due to the presence of compressive stress acting in the deck components induced from the stay cables. Difficulties associated with the deck replacement in a cable-stayed bridge and the possible solutions to overcome them are discussed in this paper. Major considerations to be made during deck replacement in a cable-stayed bridge are the prevention of distortion when pre-cast deck panels are removed unsymmetrically with respect to the center line of the bridge, additional compressive stress induced in the deck system and upward deflection of the deck due to the temporary reduction in the weight of deck. To circumvent these problems, it is desirable that the length of the portion being replaced is not too long; on the other hand, if a very small stretch is replaced at a time, the time required for deck replacement can be very high. Therefore, in this paper an optimum length for deck replacement is sought. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2067 / 2078
页数:12
相关论文
共 6 条
[1]  
*CASE CTR, 2000, GT STRUDL US MAN
[2]  
Gimsing N., 1997, CABLE SUPPORTED BRID, V2nd
[3]  
Troitsky M.S., 1988, CABLE STAYED BRIDGES, V2nd
[4]  
Troitsky M.S., 1977, Cable-Stayed Bridges Theory and design'
[5]  
Walther R., 1999, CABLE STAYED BRIDGES, VSecond
[6]  
2000, CHDX0282