Numerical Study on Water Sealing Effect of Freeze-Sealing Pipe-Roof Method Applied in Underwater Shallow-Buried Tunnel

被引:6
|
作者
Hong, Zequn [1 ]
Zhang, Jun [2 ]
Han, Lei [3 ]
Wu, Yuanhao [4 ]
机构
[1] China Univ Min & Technol, Sch Mech & Civil Engn, State Key Lab Geomech & Deep Underground Engn, Xuzhou, Jiangsu, Peoples R China
[2] CCCC Second Highway Consultants Co Ltd, Wuhan, Peoples R China
[3] Tongji Univ, Dept Geotech Engn, Shanghai, Peoples R China
[4] China Construct Eighth Engn Div Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
underwater tunnel; freeze-sealing pipe roof; temperature field; frozen curtain; freezing effect; STATE TEMPERATURE-FIELD;
D O I
10.3389/fphy.2021.794374
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
The freezing-sealing pipe-roof method is a new presupporting technique, which fully combines the advantages of pipe-roof method and artificial ground-freezing method, and can adapt to the construction needs of underground projects in complex and sensitive strata. After the Gongbei Tunnel of Hong Kong-Zhuhai-Macao Bridge, this method will be applied for the first time in an underwater shallow-buried railroad tunnel, and there are still many urgent problems to be solved. In this article, based on the field situation and the preliminary design scheme, a convective heat transfer model under complex boundary conditions was first established. Then, the development of frozen wall thickness during the active freezing period was solved by numerical simulation for three different pipe filling modes, and the cloud map of temperature distribution in the whole section is analyzed. After that, the moving state of river water was characterized by different heat transfer coefficients, and the weakening effect of flow velocity on the top freezing wall was studied. Finally, six critical water sealing paths were selected, and the temperature differences of the frozen curtain were calculated. The results show that the mode with interval concrete filling can form a reliable frozen curtain within the scheduled time, whereas the nonfilling mode cannot achieve the water sealing requirement. River water has a large effect on the temperature at the boundary of jacking pipe and almost no effect on the center of the jacked pipe. It takes approximately 15 days from the frozen soil covering the pipe wall to reach the designed thickness, and the freezing effect of empty pipe lags approximately 28 days compared with that of solid pipe, which requires targeted enhancement measures in field projects.
引用
收藏
页数:12
相关论文
共 24 条
  • [1] Numerical Simulation Study on Frost Heave during the Freezing Phase of Shallow-Buried and Undercut Tunnel Using the Freeze-Sealing Pipe Roof Method
    Duan, Yin
    Rong, Chuanxin
    Long, Wei
    APPLIED SCIENCES-BASEL, 2023, 13 (18):
  • [2] Frozen curtain characteristics during excavation of submerged shallow tunnel using Freeze-Sealing Pipe-Roof method
    Niu, Ye
    Hong, ZeQun
    Zhang, Jun
    Han, Lei
    RESEARCH IN COLD AND ARID REGIONS, 2022, 14 (04) : 267 - 273
  • [3] Frozen curtain characteristics during excavation of submerged shallow tunnel using Freeze-Sealing Pipe-Roof method
    Ye Niu
    ZeQun Hong
    Jun Zhang
    Lei Han
    ResearchinColdandAridRegions, 2022, 14 (04) : 259 - 266
  • [4] A Field Study on the Freezing Characteristics of Freeze-Sealing Pipe Roof Used in Ultra-Shallow Buried Tunnel
    Hu, Xiangdong
    Wu, Yuanhao
    Li, Xinyi
    APPLIED SCIENCES-BASEL, 2019, 9 (08):
  • [5] Mechanical behavior of shallow embedded and large cross-section tunnel supporting using freeze-sealing pipe-roof method
    Zhang, D.M.
    Pang, J.
    Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art- Proceedings of the WTC 2019 ITA-AITES World Tunnel Congress, 2019, : 1607 - 1616
  • [6] Model Test and Numerical Simulation Analysis on Freezing Effect of Different Freezers in Freeze-Sealing Pipe-Roof Method
    Cai, Haibing
    Liu, Yujie
    Hong, Rongbao
    Li, Mengkai
    Wang, Zongjin
    Ding, Hanglong
    Ye, Xinyu
    GEOFLUIDS, 2022, 2022
  • [7] Numerical Analyses of Frost Heave on Gongbei Tunnel Constructed by Freeze-sealing Pipe Roof Method
    Li Jian
    Chen Jin
    Guo XiaoDong
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHATRONICS, ELECTRONIC, INDUSTRIAL AND CONTROL ENGINEERING, 2015, 8 : 847 - 851
  • [8] Frost heave and thawing settlement of the ground after using a freeze-sealing pipe-roof method in the construction of the Gongbei Tunnel
    Cai, Haibing
    Hong, Rongbao
    Xu, Liuxun
    Wang, Changbai
    Rong, Chuanxin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 125
  • [9] Effect of water-proofing in Gongbei Tunnel by freeze-sealing pipe roof method with field temperature data
    Hu X.-D.
    Li X.-Y.
    Wu Y.-H.
    Han L.
    Zhang C.-B.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 (12): : 2207 - 2214
  • [10] Experimental study on active freezing scheme of freeze-sealing pipe roof used in ultra-shallow buried tunnels
    Ren H.
    Hu X.-D.
    Hong Z.-Q.
    Zhang J.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 (02): : 320 - 328