Fuzzy job shop scheduling with lot-sizing

被引:42
作者
Petrovic, Sanja [1 ]
Fayad, Carole [1 ]
Petrovic, Dobrila [2 ]
Burke, Edmund [1 ]
Kendall, Graham [1 ]
机构
[1] Univ Nottingham, Sch Comp Sci, Nottingham NG8 1BB, England
[2] Coventry Univ, Fac Engn & Comp, Coventry CV1 5FB, W Midlands, England
基金
英国工程与自然科学研究理事会;
关键词
job shop scheduling; fuzzy rule-based system; lot-sizing; batching; fuzzy multi-objective genetic algorithm; real-world application; dispatching rules;
D O I
10.1007/s10479-007-0287-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper deals with a problem of determining lot-sizes of jobs in a real-world job shop-scheduling in the presence of uncertainty. The main issue discussed in this paper is lot-sizing of jobs. A fuzzy rule-based system is developed which determines the size of lots using the following premise variables: size of the job, the static slack of the job, workload on the shop floor, and the priority of the job. Both premise and conclusion variables are modelled as linguistic variables represented by using fuzzy sets (apart from the priority of the job which is a crisp value). The determined lots' sizes are input to a fuzzy multi-objective genetic algorithm for job shop scheduling. Imprecise jobs' processing times and due dates are modelled by using fuzzy sets. The objectives that are used to measure the quality of the generated schedules are average weighted tardiness of jobs, the number of tardy jobs, the total setup time, the total idle time of machines and the total flow time of jobs. The developed algorithm is analysed on real-world data obtained from a printing company.
引用
收藏
页码:275 / 292
页数:18
相关论文
共 35 条
[1]   A fuzzy-linguistic approach to a multi-criteria sequencing problem [J].
Adamopoulos, GI ;
Pappis, CP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 92 (03) :628-636
[2]   A heuristic approach to batching and scheduling a single machine to minimize setup costs [J].
Agnetis, A ;
Alfieri, A ;
Nicosia, G .
COMPUTERS & INDUSTRIAL ENGINEERING, 2004, 46 (04) :793-802
[3]  
[Anonymous], SCHEDULING FUZZINESS
[4]   The job shop scheduling problem: Conventional and new solution techniques [J].
Blazewicz, J ;
Domschke, W ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 93 (01) :1-33
[5]  
DEMPSTER MA, 1982, DETERMINISTIC STOCHS
[6]   Lot sizing and scheduling - Survey and extensions [J].
Drexl, A ;
Kimms, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (02) :221-235
[7]  
FARGIER H, 1996, FUZZY INFORM ENG GUI
[8]  
Fayad C, 2005, LECT NOTES ARTIF INT, V3533, P524
[9]  
GOLDBERG DE, 1989, GENETIC ALGORITHM SE
[10]  
Gordon VS., 2004, Handbook of SCHEDULING: Algorithms Models and Performance Analysis