A systems dynamics approach to the management of material procurement for Engineering, Procurement and Construction industry

被引:30
作者
Bajomo, Mary [1 ]
Ogbeyemi, Akinola [1 ]
Zhang, Wenjun [1 ]
机构
[1] Univ Saskatchewan, Dept Mech Engn, 57 Campus Dr, Saskatoon, SK S7N 5A9, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Supply chain network; Construction material supply chain; Systems dynamics; Causal loop diagram; EPC; SUPPLY CHAIN COLLABORATION; MODEL; PERFORMANCE; PROJECTS; DESIGN; IMPACT; DELAY; COST; FLEXIBILITY; PERSPECTIVE;
D O I
10.1016/j.ijpe.2021.108390
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The importance of managing material procurement and logistics towards the success of construction projects cannot be overemphasized. This is especially true to the Engineering, Procurement and Construction (EPC) industry. Project management in EPC often encounters the problems such as cost overrun, schedule overrun, delay in material supply, and loss of productivity. To overcome these problems for achieving a sustainable EPC system, it is necessary to explore the underlying causes of these problems and study policies to tackle them. In this connection, this paper presents a systems dynamic model of the construction material supply chain (CMSC) in EPC, capturing the attributes relevant to the foregoing problems and the policies that are expected to overcome these problems. The model was validated with several standard tests assisted by the industrial manager of the CMSC in EPC. After that, a simulation study based on the model was conducted, which shows that the model can be a useful tool for decision makers for the CMSC in EPC to streamline their policies in managing a particular CMSC to overcome the foregoing problems. The main contribution of this paper is the provision of a comprehensive tool for quantitatively assisting in the management of the CMSC in EPC. A secondary contribution is that some specific knowledge is obtained to overcome the foregoing problems from the simulation study.
引用
收藏
页数:14
相关论文
共 101 条
[1]   The impact of supply chain relationships and integration on innovative capabilities and manufacturing performance: the perspective of rapidly developing countries [J].
Adebanjo, Dotun ;
Teh, Pei-Lee ;
Ahmed, Pervaiz K. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (04) :1708-1721
[2]   Combining simple motion measurement, lean analysis technique and historical data review for countering negative labor cost variance: A case study [J].
Adeyemi, Bami ;
Ogbeyemi, Akinola ;
Zhang, Wenjun .
INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 2021, 13
[3]   Managing uncertainty through supply chain flexibility: reactive vs. proactive approaches [J].
Angkiriwang, Reina ;
Pujawan, I. Nyoman ;
Santosa, Budi .
PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2014, 2 (01) :50-70
[4]  
[Anonymous], 1997, Construction Management and Economics, DOI [10.1080/014461997373132, DOI 10.1080/014461997373132]
[5]  
[Anonymous], 2000, European Journal of Purchasing Supply Management, DOI [DOI 10.1016/S0969-7012(00)00013-7, 10.1016/S0969-7012(00)00013-7]
[6]   CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS [J].
ASSAF, SA ;
ALKHALIL, M ;
ALHAZMI, M .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) :45-50
[7]  
Barlas Y, 1996, SYST DYNAM REV, V12, P183, DOI 10.1002/(SICI)1099-1727(199623)12:3<183::AID-SDR103>3.0.CO
[8]  
2-4
[9]   An evaluation of partnership development in the construction industry [J].
Beach, R. ;
Webster, M. ;
Campbell, K.M. .
International Journal of Project Management, 2005, 23 (08) :611-621
[10]  
Bergstrand K., 2016, THESIS ROYAL I TECHN